Size: 3899
Comment:
|
Size: 1160
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== Weekly PEM meeting == * 2019/7/09(Tue) 17:00-(JST) * Regular meeting meeting * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) |
|
Line 6: | Line 9: |
* General issue | * General issue * Will be appear soon |
Line 8: | Line 12: |
* KAGRA interferometer status * PRC loss was large, birefringence effect? * FPMI or SRFPMI or DRFPMI * Open the CS area and remove the PRM and SRM? * Before that, we want to investigate the scattering effect at CS area * Chrome Book project * Portable PEM researcher * Spectral analyzer, sound recording, ... * USB accelerometer ([[attachment:20190628_summary.pdf|Center area]]), microphone, ... * Data sharing [[https://drive.google.com/open?id=1zIturCCaSe7mmP0s15TcRzHsvNvomP5k|GoogleDrive]] * Weekly PEM measurement * Friday is temporal weekly PEM measurement * Understanding the effect of the instruments and so on * Power supply * duct vibration * PEM DAQ sampling rate * Due to the limited DAQ power, almost all PEMs are taken at 2kHz sampling * Only PSL and CS microphone are taken with 16kHz sampling for the noise hunting * PEM injection * Shaker injection1 (Yikang, Yokozawa) * Shaker injection2 (Okutomi, Fabian) * acoustic injection (TTanaka) * magnetic field injection (Yikang, Yokozawa) * RF injection (TTanaka, Washimi) * 1st engineering run * 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity * Preparing toward the next engineering run * Next engineering run : 13th Jul. * Interferometer configuration ? * English meeting * We will have a monthly English meeting(Mainly share the information with Virgo people) * The third Tuesday of every month 17:00-(JST) 10:00-(CEST) * 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/190716/Agenda|URL]] * Seismon issue * We already installed to KAGRA system * Need the tuning for the KAGRA * Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???) * Task list toward the O3 * [[https://docs.google.com/spreadsheets/d/1DSltWg18KrwnfkVJmSm09TkQ82aQ5lHAdaC9uCozGC0/edit#gid=1072504162|task sheet]] * Please send e-mail to me if you have comments. * each member progress |
|
Line 60: | Line 14: |
* We started the investigation around the EX0 rack today. * With Pcal noise investigation |
* Coherent analysis with PEMs * Xend PCal Rx module noise hunting! |
Line 63: | Line 17: |
* Plan for cryochamber characterization * Sound reverberation analysis * Kaminari monitoring |
|
Line 64: | Line 21: |
* Google chrome project * Accelerometer and microphone * They are very useful, especially potable feature is great. * Several spectral with short spectrogram was shown |
* Google chrome |
Line 70: | Line 24: |
* Debugging now * Current a few days failed? |
|
Line 77: | Line 29: |
* One year trend is now opened consistent with Sekiguchi-san. Time variance check. * 0.2Hz source dependence (0.15Hz??) * 1.2Hz came from the ikenoyama river, observed during bKAGRA phase1 * Future issue is written in his github, welcome the comments * Future discussion towards the English meeting |
|
Line 84: | Line 31: |
* Web page ready, pick up information by the k1script ready, remaining issue is making the epics channel and caput | |
Line 87: | Line 33: |
* Speaker will be arrived tomorrow | |
Line 89: | Line 34: |
* Check with the coherent and non-coherent component | |
Line 91: | Line 35: |
* JGW Doc | |
Line 94: | Line 37: |
* Kaihotsu * Report about the KIW6 * Questions * They will join to KAGRA PEM once of the every week (Friday?) |
* Kaihotsu, Mori * Weekly PEM measurements |
Weekly PEM meeting
- 2019/7/09(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
=== Agenda ===
- General issue
- Will be appear soon
- Yokozawa
- Power supply issue
- Coherent analysis with PEMs
- Xend PCal Rx module noise hunting!
- Washimi
- Plan for cryochamber characterization
- Sound reverberation analysis
- Kaminari monitoring
- Others and plan toward the JPS meeting
- Google chrome
- Kozakai
- Trigger event identification
- Yuzu summary page comments
- Others and plan toward the JPS meeting
- Miyo
- Effect the protect shied to the seismometer
Long term study of the KAGRA ground motion Link
- Oshino
- Weather station issue
- TTanaka
- Preparing for the PEM injection
- Microphone calibration
- Thesis agenda and plan toward the JPS meeting
- Okutomi
- Shaker injection
- Kaihotsu, Mori
- Weekly PEM measurements
- Yuzurihara
- Yuzu summary page comments
- etc
- github progress