== Weekly PEM meeting == * 2019/7/09(Tue) 17:00-(JST) * Regular meeting meeting * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) |
|
Line 6: | Line 9: |
* General issue | * General issue |
Line 8: | Line 11: |
* KAGRA interferometer status * PRC loss was large, birefringence effect? * FPMI or SRFPMI or DRFPMI * Open the CS area and remove the PRM and SRM? * Before that, we want to investigate the scattering effect at CS area * Chrome Book project |
* Chrome Book project(->Washimi report) |
Line 17: | Line 14: |
* USB accelerometer ([[attachment:20190628_summary.pdf|Center area]]), microphone, ... | * USB accelerometer, microphone, magnetometer... |
Line 25: | Line 22: |
* PEM DAQ sampling rate * Due to the limited DAQ power, almost all PEMs are taken at 2kHz sampling * Only PSL and CS microphone are taken with 16kHz sampling for the noise hunting |
* PCal Rx PD noise budget : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10397|result]] |
Line 42: | Line 36: |
* Interferometer configuration ? | * Interferometer configuration MICH |
Line 48: | Line 42: |
Line 57: | Line 52: |
* each member progress | |
Line 60: | Line 55: |
* We started the investigation around the EX0 rack today. * With Pcal noise investigation |
* Coherent analysis with PEMs * Xend PCal Rx module noise hunting! |
Line 63: | Line 58: |
* Others and plan toward the JPS meeting * Google chrome project * Accelerometer and microphone * They are very useful, especially potable feature is great. * Several spectral with short spectrogram was shown |
* Plan for cryochamber characterization * Sound reverberation analysis : no update * Kaminari monitoring : learning now... * Others and plan toward the JPS meeting : no update * Google chrome [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable|wiki page]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10385|USB magnetometer]] |
Line 70: | Line 65: |
* Debugging now * Current a few days failed? |
|
Line 77: | Line 70: |
* One year trend is now opened consistent with Sekiguchi-san. Time variance check. * 0.2Hz source dependence (0.15Hz??) * 1.2Hz came from the ikenoyama river, observed during bKAGRA phase1 * Future issue is written in his github, welcome the comments * Future discussion towards the English meeting |
|
Line 84: | Line 72: |
* Web page ready, pick up information by the k1script ready, remaining issue is making the epics channel and caput | |
Line 87: | Line 74: |
* Speaker will be arrived tomorrow | |
Line 89: | Line 75: |
* Check with the coherent and non-coherent component | |
Line 91: | Line 76: |
* JGW Doc | |
Line 94: | Line 78: |
* Kaihotsu * Report about the KIW6 * Questions * They will join to KAGRA PEM once of the every week (Friday?) |
* Kaihotsu, Mori * Weekly PEM measurements |
Weekly PEM meeting
- 2019/7/09(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
=== Agenda ===
- General issue
Chrome Book project(->Washimi report)
- Portable PEM researcher
- Spectral analyzer, sound recording, ...
- USB accelerometer, microphone, magnetometer...
Data sharing GoogleDrive
- Weekly PEM measurement
- Friday is temporal weekly PEM measurement
- Understanding the effect of the instruments and so on
- Power supply
- duct vibration
PCal Rx PD noise budget : result
- PEM injection
- Shaker injection1 (Yikang, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka)
- magnetic field injection (Yikang, Yokozawa)
- RF injection (TTanaka, Washimi)
- 1st engineering run
- 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
- Preparing toward the next engineering run
- Next engineering run : 13th Jul.
- Interferometer configuration MICH
- English meeting
- We will have a monthly English meeting(Mainly share the information with Virgo people)
- The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL
- Seismon issue
- We already installed to KAGRA system
- Need the tuning for the KAGRA
- Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
- Task list toward the O3
- Please send e-mail to me if you have comments.
- Yokozawa
- Power supply issue
- Coherent analysis with PEMs
- Xend PCal Rx module noise hunting!
- Washimi
- Plan for cryochamber characterization
- Sound reverberation analysis : no update
- Kaminari monitoring : learning now...
- Others and plan toward the JPS meeting : no update
Google chrome wiki page, USB magnetometer
- Kozakai
- Trigger event identification
- Yuzu summary page comments
- Others and plan toward the JPS meeting
- Miyo
- Effect the protect shied to the seismometer
Long term study of the KAGRA ground motion Link
- Oshino
- Weather station issue
- TTanaka
- Preparing for the PEM injection
- Microphone calibration
- Thesis agenda and plan toward the JPS meeting
- Okutomi
- Shaker injection
- Kaihotsu, Mori
- Weekly PEM measurements
- Yuzurihara
- Yuzu summary page comments
- etc
- github progress