Size: 2832
Comment:
|
Size: 3342
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
washim, kozakai, oshino, ttanaka, fujikawa kaihotu,ohkawa, yamamoto, mori |
|
Line 10: | Line 12: |
* Wiki page Renewal |
|
Line 22: | Line 26: |
* PCal Rx PD noise budget | * PCal Rx PD noise budget : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10397|result]] |
Line 59: | Line 63: |
* Sound reverberation analysis * Kaminari monitoring * Others and plan toward the JPS meeting * Google chrome |
* Sound reverberation analysis : no update * Kaminari monitoring : learning now... * Others and plan toward the JPS meeting : no update * Google chrome [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable|wiki page]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10385|USB magnetometer]] |
Line 73: | Line 77: |
* Preparing for the PEM injection | * Preparing for the PEM injection[[https://drive.google.com/open?id=1FU3kaMimwzHkcS_L0urzAi4EFV7loPwSGgoPO4H8mVo|slide]] |
Weekly PEM meeting
- 2019/7/09(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
washim, kozakai, oshino, ttanaka, fujikawa kaihotu,ohkawa, yamamoto, mori
=== Agenda ===
- General issue
- Wiki page Renewal
Chrome Book project(->Washimi report)
- Portable PEM researcher
- Spectral analyzer, sound recording, ...
- USB accelerometer, microphone, magnetometer...
Data sharing GoogleDrive
- Weekly PEM measurement
- Friday is temporal weekly PEM measurement
- Understanding the effect of the instruments and so on
- Power supply
- duct vibration
PCal Rx PD noise budget : result
- PEM injection
- Shaker injection1 (Yikang, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka)
- magnetic field injection (Yikang, Yokozawa)
- RF injection (TTanaka, Washimi)
- 1st engineering run
- 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
- Preparing toward the next engineering run
- Next engineering run : 13th Jul.
- Interferometer configuration MICH
- English meeting
- We will have a monthly English meeting(Mainly share the information with Virgo people)
- The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL
- Seismon issue
- We already installed to KAGRA system
- Need the tuning for the KAGRA
- Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
- Task list toward the O3
- Please send e-mail to me if you have comments.
- Yokozawa
- Power supply issue
- Coherent analysis with PEMs
- Xend PCal Rx module noise hunting!
- Washimi
- Plan for cryochamber characterization
- Sound reverberation analysis : no update
- Kaminari monitoring : learning now...
- Others and plan toward the JPS meeting : no update
Google chrome wiki page, USB magnetometer
- Kozakai
- Trigger event identification
- Yuzu summary page comments
- Others and plan toward the JPS meeting
- Miyo
- Effect the protect shied to the seismometer
Long term study of the KAGRA ground motion Link
- Oshino
- Weather station issue
- TTanaka
Preparing for the PEM injectionslide
- Microphone calibration
- Thesis agenda and plan toward the JPS meeting
- Okutomi
- Shaker injection
- Kaihotsu, Mori
- Weekly PEM measurements
- Yuzurihara
- Yuzu summary page comments
- etc
- github progress