Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2019-06-25 11:25:49
Size: 295
Comment:
Revision 3 as of 2019-07-10 15:45:55
Size: 560
Comment:
Deletions are marked like this. Additions are marked like this.
Line 10: Line 10:
  * Yokozawa
   * KAGRA detector status
   * Update of the KAGRA PEM from last meeting
Line 11: Line 14:
   *
   *
   * Virgo PEM
Line 14: Line 16:
   *
   *
   *
   * Sound reverberation time analysis
   * Google chrome project (portable PEM)
  * Miyo
   * Trend of the ground motion
  * Kozakai, Yuzurihara
   * Introduction of the glitch analysis

Weekly PEM meeting

  • 2019/7/16(火) 17:00-(JST) 10:00-(CEST)
  • Monthly English meeting

=== Agenda ===

  • General issue
    • Engineering run Jun 8th
  • each member progress
    • Yokozawa
      • KAGRA detector status
      • Update of the KAGRA PEM from last meeting
    • Federico, Irene
      • Virgo PEM
    • Washimi 
      • Sound reverberation time analysis
      • Google chrome project (portable PEM)
    • Miyo
      • Trend of the ground motion
    • Kozakai, Yuzurihara
      • Introduction of the glitch analysis
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190716/Agenda (last edited 2019-07-16 17:29:09 by chihiro.kozakai)