Size: 295
Comment:
|
Size: 619
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* Engineering run Jun 8th | * 1st Engineering run Jun 8th (Xarm cavity) * 2nd Engineering run Jul 13th (MICH) |
Line 10: | Line 11: |
* Yokozawa * KAGRA detector status * Update of the KAGRA PEM from last meeting |
|
Line 11: | Line 15: |
* * |
* Virgo PEM |
Line 14: | Line 17: |
* * * |
* Sound reverberation time analysis * Google chrome project (portable PEM) * Miyo * Trend of the ground motion * Kozakai, Yuzurihara * Introduction of the glitch analysis |
Weekly PEM meeting
- 2019/7/16(火) 17:00-(JST) 10:00-(CEST)
- Monthly English meeting
=== Agenda ===
- General issue
- 1st Engineering run Jun 8th (Xarm cavity)
- 2nd Engineering run Jul 13th (MICH)
- each member progress
- Yokozawa
- KAGRA detector status
- Update of the KAGRA PEM from last meeting
- Federico, Irene
- Virgo PEM
- Washimi
- Sound reverberation time analysis
- Google chrome project (portable PEM)
- Miyo
- Trend of the ground motion
- Kozakai, Yuzurihara
- Introduction of the glitch analysis
- etc
- Yokozawa
- github progress