Size: 619
Comment:
|
← Revision 10 as of 2019-07-16 17:29:09 ⇥
Size: 911
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
* Update of the KAGRA PEM from last meeting | * Update of the KAGRA PEM from last meeting [[attachment:PEM_meeting_190716.pdf|pdf]] * Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10447|slide]] * Chromebook project (portable PEM) * Sound reverberation time analysis * Miyo * Trend of the ground motion [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10443|Link]] * Kozakai, Yuzurihara * Introduction of the glitch analysis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10454|slides]] |
Line 16: | Line 23: |
* Washimi * Sound reverberation time analysis * Google chrome project (portable PEM) * Miyo * Trend of the ground motion * Kozakai, Yuzurihara * Introduction of the glitch analysis |
Weekly PEM meeting
- 2019/7/16(火) 17:00-(JST) 10:00-(CEST)
- Monthly English meeting
=== Agenda ===
- General issue
- 1st Engineering run Jun 8th (Xarm cavity)
- 2nd Engineering run Jul 13th (MICH)
- each member progress
- github progress