Differences between revisions 1 and 2
Revision 1 as of 2019-07-16 14:54:08
Size: 146
Comment:
Revision 2 as of 2019-07-16 14:54:46
Size: 848
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:

 * General issue
  * 1st Engineering run Jun 8th (Xarm cavity)
  * 2nd Engineering run Jul 13th (MICH)
 * each member progress
  * Yokozawa
   * KAGRA detector status
   * Update of the KAGRA PEM from last meeting [[attachment:PEM_meeting_190716.pdf|pdf]]
  * Washimi [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10447|slide]]
   * Chromebook project (portable PEM)
   * Sound reverberation time analysis
  * Miyo
   * Trend of the ground motion [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10443|Link]]
  * Kozakai, Yuzurihara
   * Introduction of the glitch analysis
  * Federico, Irene
   * Virgo PEM
  * etc

 * github progress

Minute of PEM meeting


  • Date: 2019/7/16 17:00-18:00(JST) 10:00-11:00(CEST)
  • Attendance:
  • English meeting

=== Agenda ===

  • General issue
    • 1st Engineering run Jun 8th (Xarm cavity)
    • 2nd Engineering run Jul 13th (MICH)
  • each member progress
    • Yokozawa
      • KAGRA detector status
      • Update of the KAGRA PEM from last meeting pdf

    • Washimi slide

      • Chromebook project (portable PEM)
      • Sound reverberation time analysis
    • Miyo
      • Trend of the ground motion Link

    • Kozakai, Yuzurihara
      • Introduction of the glitch analysis
    • Federico, Irene
      • Virgo PEM
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190716/Minute (last edited 2019-07-16 18:33:08 by TakaakiYokozawa)