Differences between revisions 1 and 2
Revision 1 as of 2019-07-22 06:51:35
Size: 3386
Comment:
Revision 2 as of 2019-07-22 06:56:34
Size: 3525
Comment:
Deletions are marked like this. Additions are marked like this.
Line 16: Line 16:
   * Chrome Book project
   * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
     * Portable PEM researcher
     * Spectral analyzer, sound recording, terminal, ...
   * USB accelerometer, microphone, magnetometer...
     * Data sharing GoogleDrive
  * Chrome Book project
   * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
   * Portable PEM researcher
   * Spectral analyzer, sound recording, terminal, ...
   * USB accelerometer, microphone, magnetometer...
   * Data sharing GoogleDrive
Line 23: Line 23:
   * medm upgrade   * medm upgrade
   * CS PEM medm(TTanaka), Weather station(KTanaka)
   * In future, weather report(pdf), weather flag(including the ground motion)
Line 25: Line 27:
   * Weekly PEM measurement
      * Friday is temporal weekly PEM measurement
      * Understanding the effect of the instruments and so on
      * Power supply
      *
duct vibration
   
* PCal Rx PD noise budget : result
 
    * PE
M injection
      * Shaker injection
1 (Yikang, Yokozawa)
      * Shaker injection
2 (Okutomi, Fabian)
      * acoustic injection (TTanaka)
      * magnetic field injection (Yikang, Yokozawa)
      * RF injection (TTanaka, Washimi)
  * Weekly PEM measurement
   * Friday is temporal weekly PEM measurement
   * Understanding the effect of the instruments and so on
   * Power supply, duct vibration, instruments
* PCal Rx PD noise budget (7/5)
   * IYC vibration (7/12)
   *
Many small issues (7/19)
   * IXC vibration (7/
26)
Line 39: Line 36:
    * 1st engineering run
      * 1st engineering run : Jun. 8th 12:00-18:00(JST) : Xarm cavity
      * Preparing toward the next engineering run
  * PEM injection
   * Shaker injection1 (Yikang, TTanaka, Yokozawa)
   * Shaker injection2 (Okutomi, Fabian)
   * acoustic injection (TTanaka, Yokozawa)
   * magnetic field injection (Yikang, Yokozawa)
   * RF injection (TTanaka, Washimi)
Line 43: Line 43:
   * Next engineering run : 13th Jul.
      * Interferometer configuration MICH
  * 2nd engineering run : 13th Jul.
   * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/RUN/ER190713|information]]
* Interferometer configuration MICH
   

Weekly PEM meeting

  • 2019/7/23(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

参加者:

Agenda

  • General issue
    • Wiki page Renewal(Thanks Washimi-san)
      • Please let us know if you noticed.
    • Chrome Book project
    • medm upgrade
      • CS PEM medm(TTanaka), Weather station(KTanaka)
      • In future, weather report(pdf), weather flag(including the ground motion)
    • Weekly PEM measurement
      • Friday is temporal weekly PEM measurement
      • Understanding the effect of the instruments and so on
      • Power supply, duct vibration, instruments
      • PCal Rx PD noise budget (7/5)
      • IYC vibration (7/12)
      • Many small issues (7/19)
      • IXC vibration (7/26)
    • PEM injection
      • Shaker injection1 (Yikang, TTanaka, Yokozawa)
      • Shaker injection2 (Okutomi, Fabian)
      • acoustic injection (TTanaka, Yokozawa)
      • magnetic field injection (Yikang, Yokozawa)
      • RF injection (TTanaka, Washimi)
    • 2nd engineering run : 13th Jul.
      • information

      • Interferometer configuration MICH
        • English meeting
          • We will have a monthly English meeting(Mainly share the information with Virgo people)
          • The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
          • 2nd meeting will be held at 16th Jul.(Tue) 17:00-18:00 URL
        • Seismon issue
          • We already installed to KAGRA system
          • Need the tuning for the KAGRA
          • Large earthquake happened this month, we "should" be a safe mode before coming large earthquake (PEM issue???)
        • Task list toward the O3
          • task sheet

          • Please send e-mail to me if you have comments.
    • Yokozawa
      • Power supply issue
      • Coherent analysis with PEMs
      • Xend PCal Rx module noise hunting!
    • Washimi 
      • Plan for cryochamber characterization
      • Sound reverberation analysis : no update
      • Kaminari monitoring : learning now...
      • Others and plan toward the JPS meeting : no update
      • Google chrome wiki page, USB magnetometer, Data sharing GoogleDrive

    • Kozakai
      • Trigger event identification
      • Yuzu summary page comments
      • Others and plan toward the JPS meeting
    • Miyo
      • Effect the protect shied to the seismometer
      • Long term study of the KAGRA ground motion Link

    • Oshino
      • Weather station issue
    • TTanaka
      • Preparing for the PEM injectionslide

      • Microphone calibration
      • Thesis agenda and plan toward the JPS meeting
    • Okutomi
      • Shaker injection
    • Kaihotsu, Mori
      • Weekly PEM measurements
    • Yuzurihara
      • Yuzu summary page comments
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190723/Agenda (last edited 2019-07-24 09:02:44 by taiki.tanaka)