Differences between revisions 1 and 2
Revision 1 as of 2019-08-29 10:47:11
Size: 323
Comment:
Revision 2 as of 2019-08-29 11:21:55
Size: 775
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Date: 2019/7/16 17:00-18:00(JST) 10:00-11:00(CEST)  * Date: 2019/8/20 17:00-18:00(JST) 10:00-11:00(CEST)
Line 7: Line 7:
 * Join : Yokozawa, Oshino, Terrence, Fabian, Washimi, Kozakai, Miyo, Federico, Jan, TTanaka, Irene, Okawa, Fujikawa, Mori, Kaihotsu, controls, Yuzurihara, Yamamoto, Takahashi  * Join : Yokozawa, Kokeyama, Washimi, Kozakai, Fujikawa, TTanaka, Irene, Federico, Mori, Yuzurihara, Oshino, Ohkawa
Line 10: Line 10:

 * General issue
   * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
   * Virgo status & PEM working plan on Octover (Federico, Irene) [[attachment:Kagra_PEM_meeting_Aug20.pdf|pdf]]
   * Plan to visit Virgo (Washimi) [[attachment:VirgoPlan.pdf|Slide]]

 * each member progress
  * Washimi 
   * Sound reverberation time analysis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=10551|Slide]]
  * --(Miyo)--
   * --(Trend of the ground motion)--

Minute of PEM meeting


  • Date: 2019/8/20 17:00-18:00(JST) 10:00-11:00(CEST)
  • Attendance:
  • English meeting
  • Join : Yokozawa, Kokeyama, Washimi, Kozakai, Fujikawa, TTanaka, Irene, Federico, Mori, Yuzurihara, Oshino, Ohkawa

=== Agenda ===

  • General issue
    • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)

    • Virgo status & PEM working plan on Octover (Federico, Irene) pdf

    • Plan to visit Virgo (Washimi) Slide

  • each member progress
    • Washimi 
      • Sound reverberation time analysis Slide

    • Miyo

      • Trend of the ground motion

KAGRA/Subgroups/PEM/Meeting/190820/Minute (last edited 2019-08-29 11:41:33 by TakaakiYokozawa)