* 2019/9/3(Tue) 17:00-(JST) | * 2019/9/24(Tue) 17:00-(JST) |
Line 10: | Line 10: |
* Conference * [[http://www-kam2.icrr.u-tokyo.ac.jp/indico/event/3/timetable|TAUP@Toyama]] (9/8-9/14) * Yokozawa (9/10) "Investigation of the environment influence for the underground and cryogenic gravitational wave detector, KAGRA." * [[https://w4.gakkai-web.net/jps_search/2019au/data/html/programu.html|JPS@Yamagata]] (9/17-9/20) * Washimi (19aT11-3) 「KAGRAにおける環境雑音モニターの現状と冷凍装置由来の雑音評価」 * TTanaka (19aT11-4) 「KAGRAにおける環境雑音注入試験と評価」 |
|
Line 22: | Line 15: |
* Weekly PEM injection * Commissioning team suggest to have a weekly PME injection/measurement day with interferometer signal * First candidate : Every Friday * Show the plan for the PEM injection |
* Current urgent noise [[attachment:PEM_working_list_190916.pdf|pdf]] |
Line 30: | Line 19: |
* We prepared two PEM Chromebook | * We prepared two PEM Chromebook * Start writing paper (PTEP?) |
Line 37: | Line 27: |
* SR3, serious 16Hz noise investigation |
* --(SR3, serious 16Hz noise investigation)-- |
Line 56: | Line 45: |
* Tentative : Preparing the magnetic field injection and turned on/off the vacuum pump(2019/8/30) | * Tentative : Vacuum duct vibration measurement |
Line 61: | Line 50: |
* Virgo-KAGRA meeting -> Tomorrow | |
Line 62: | Line 52: |
* Task list [[attachment:VIR-0887A-19.pdf.pdf|task]] | |
Line 64: | Line 55: |
* 4th meeting will be held at 17th Sep.(Tue) 17:00-18:00 URL | * 4th meeting will be held at 25th Sep.(Wed) 17:00-18:00 URL |
Line 69: | Line 60: |
Line 71: | Line 61: |
* [[https://www.icrr.u-tokyo.ac.jp/~yokozawa/KAGRA_line_database/index.html|url]] | |
Line 77: | Line 68: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10109|klog10109]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10182|klog10182]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10235|klog10235]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10273|klog]] * List of the PSL vibration noise frequency * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10173|klog10173]], [[attachment:peak.txt|list]] * Prepare for the TAUP2019 |
* Vacuum duct vibration analysis * SR3 oplev vibration |
Line 83: | Line 72: |
* Magnetic field simulation and lighting issue * Other portable PEM collaboration |
* Magnetic field simulation and lighting issue : [[http://10.68.10.87/~controls/KamioKaminari/]] * Sound reverberation analysis : [[https://github.com/gw-pem/kagra-pem/issues/152]] * Remeasurement @ Y-arm * Analysis on Chromebook (for the measurement @ Virgo) * Prepare for Virgo visiting |
Line 87: | Line 79: |
* Glitch issue * Night shift summary * Pick up the requirement to PEM for the JPS meeting |
* iKozapy |
Line 100: | Line 90: |
* Kaihotsu * Comparison between portable PEM and KAGRA ADC PEM * Vacuum pump turned on and off[[attachment:slide.pdf|pdf]] |
* Kaihotsu, Mori * SR's vibration[[attachment:sr_sride.pdf|pdf]] |
Line 105: | Line 94: |
* Fujimopy[[attachment:fujimopy|fujimopy]] | * Fujimopy |
Line 108: | Line 97: |
* Lockloss with earthquake [[attachment:slide|slide]] | * Lockloss with earthquake[[attachment:fmpy|fmpy]] |
Weekly PEM meeting
- 2019/9/24(Tue) 17:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
Agenda
- General issue
- Interferometer status
- Chrome Book project (Portable PEM researcher)
http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
- We prepared two PEM Chromebook
- Start writing paper (PTEP?)
- There are many project to collaborate with the instruments
- Task list toward the O3
- Please send e-mail to me if you have comments.
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka, Yokozawa)
- magnetic field injection (Niigata Tanaka, Yokozawa)
- RF injection (TTanaka, Washimi)
- Weekly PEM measurement
- Friday is weekly PEM measurement
- Understanding the effect of the instruments, search the origin of noise, and so on
- Power supply, duct vibration, instruments
- Tentative : Vacuum duct vibration measurement
Virgo visiting github
- We will start the discussion to visit Virgo at October
- Washimi, Sugimoto(noise huntung with portable PEM)
Virgo-KAGRA meeting -> Tomorrow
- 9/29-10/13
Task list task
English meeting : The third Tuesday of every month 17:00-(JST) 10:00-(CEST)
- 4th meeting will be held at 25th Sep.(Wed) 17:00-18:00 URL
- Measured PEM summary
- Commissionar asked us to open the measured PEM data
- Database for the KAGRA characteristic lines
- Each progress
- Yokozawa
- Coherent analysis for the FPMI, MICH and SRCL
- Vacuum duct vibration analysis
- SR3 oplev vibration
- Washimi
Magnetic field simulation and lighting issue : http://10.68.10.87/~controls/KamioKaminari/
Sound reverberation analysis : https://github.com/gw-pem/kagra-pem/issues/152
- Remeasurement @ Y-arm
- Analysis on Chromebook (for the measurement @ Virgo)
- Prepare for Virgo visiting
- Kozakai
- iKozapy
- TTanaka
- Preparing for the PEM injection
- Miyo
- Seismic motion issue if there is topic
- Okutomi
- Shaker injection
- Kaihotsu, Mori
SR's vibrationpdf
- Fujikawa, Mori
- Fujimopy
- Fujikawa
Lockloss with earthquakefmpy
- Yuzurihara
- Yuzu summary page comments
- Yamamoto
Auto Bruco klog10203
- etc
- Yokozawa
- github progress