Differences between revisions 4 and 5
Revision 4 as of 2019-09-24 17:27:14
Size: 1277
Comment:
Revision 5 as of 2019-09-24 17:33:33
Size: 1320
Comment:
Deletions are marked like this. Additions are marked like this.
Line 25: Line 25:
    * Check the bug of the png generation
  • Minute of PEM meeting =
  • Date: 2019/9/24 17:00-18:00(JST)
  • Attend:Yokozawa, Washimi, Kozakai, Oshino, Fujikawa

Agenda

  • Yokozawa
    • Coherent analysis for the FPMI, MICH and SRCL
    • Vacuum duct vibration analysis
    • SR3 oplev vibration
  • Washimi 
  • Kozakai
    • iKozapy
      • Check the bug of the png generation
  • TTanaka
    • Preparing for the PEM injection
  • Miyo
    • Seismic motion issue if there is topic
  • Okutomi
    • Shaker injection
  • Kaihotsu, Mori
    • SR's vibrationpdf

  • Fujikawa, Mori
    • Fujimopy
  • Fujikawa
    • Lockloss with earthquake
  • Yuzurihara
    • Yuzu summary page comments
  • Yamamoto
  • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/190924/Minute (last edited 2019-09-24 17:33:33 by TakaakiYokozawa)