Differences between revisions 7 and 8
Revision 7 as of 2019-10-15 16:56:12
Size: 2898
Comment:
Revision 8 as of 2019-10-15 16:56:57
Size: 2898
Comment:
Deletions are marked like this. Additions are marked like this.
Line 80: Line 80:
   * Lock loss study (pdf:same as upper)    * Lock loss study (pdf:same as above)

Weekly PEM meeting

  • 2019/10/15(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

Agenda

  • General issue
    • Interferometer status
      • Several morning runs were held (Ex: 8th October).
        • See the detail in url

        • Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection

        • Current IFO urgent noise
    • Chrome Book project (Portable PEM researcher)
      • http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable

      • We prepared two PEM Chromebook
      • Start writing paper (PTEP?)
      • There are many project to collaborate with the instruments
        • IOO, vibration, sound and magnetometer measurements inside the PSL room klog10173, list

        • ALS, the green fiber noise
        • LAS, ISS noise hunting
        • MIF, FPMI displacement
        • VIS, Around the OpLev

        • Wide 44Hz noise -> Vacuum pump?

        • BS , Serious 90Hz noise investigation
    • PEM injection
      • Shaker injection1 (TTanaka, Yokozawa)
      • Shaker injection2 (Okutomi, Fabian)
      • acoustic injection (TTanaka, Yokozawa)
      • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
      • RF injection (TTanaka, Washimi)
    • Weekly PEM measurement
      • Friday is weekly PEM measurement
      • Understanding the effect of the instruments, search the origin of noise, and so on
      • Tentative : coherent PEM channels with FPMI displacement(Last Friday), New vacuum pump(This week)
    • Virgo visiting github

      • We will start the discussion to visit Virgo at October
      • Washimi, Sugimoto(noise huntung with portable PEM)
      • 9/29-10/13
    • Database for the KAGRA characteristic lines
  • Each progress
    • Yokozawa
      • New magnetometer channels
        • K1:PEM-MAG_SR_BOOTH_SR_(X/Y/Z)_OUT_DQ
        • K1:PEM-MAG_IYC_FIELD_IYC_(X/Y/Z)_OUT_DQ
      • Coherent analysis for the FPMI, MICH and SRCL
      • Daily summary page
    • Washimi, Sugimoto 
      • Virgo visiting report(if possible)
    • Kozakai
      • Trigger analysis with silent run
    • TTanaka
      • Preparing for the PEM injection
    • TTanaka, Kaihotsu
      • Magnetic field around BS area
    • Mori, Yokozawa
      • Noise search at the IXV area pdf

    • Fujikawa, Mori
    • Fujikawa
      • Lock loss study (pdf:same as above)
    • Yamamoto
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/191015/Agenda (last edited 2019-10-16 12:50:29 by taiki.tanaka)