Differences between revisions 6 and 9 (spanning 3 versions)
Revision 6 as of 2019-10-29 04:52:00
Size: 3107
Comment:
Revision 9 as of 2019-10-29 15:47:05
Size: 3051
Comment:
Deletions are marked like this. Additions are marked like this.
Line 13: Line 13:
  * See the detail in [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/RUN/MORNINGRUN2019|url]]
    * Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection
   * See the detail in [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/RUN/MORNINGRUN2019|url]]
   * Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection
Line 24: Line 24:
  * 1slot   * 1slot Washimi-san will have a talk
Line 57: Line 57:
   * Federico, Irene, Camilla (input optics) + 1? from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)    * Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
Line 62: Line 62:
   * New magnetometer channels
    * K1:PEM-MAG_SR_BOOTH_SR_(X/Y/Z)_OUT_DQ
    * K1:PEM-MAG_IYC_FIELD_IYC_(X/Y/Z)_OUT_DQ
   * Coherent analysis for the FPMI, MICH and SRCL
   * Current serious noises
    * 18V DC noises
    * Coherent with ITMX MN YAW
    * Coherence with ITMY TM PIT
Line 68: Line 68:
  * (Washimi), Sugimoto    * Washimi
   *

  *
Sugimoto 
Line 74: Line 77:
  * TTanaka   * TTanaka(ICRR)
Line 77: Line 80:
  * TTanaka, Kaihotsu
   * Magnetic field around BS area[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10967|klog10967]]


  * Mori, Yokozawa
   * Noise search at the IXV area
  * Mori, Kaihotsu
   * Cryochamber vibration
Line 91: Line 90:
  * TTanaka(Niigata)
   * Preparation of the coil
   * 24Hz noise situation

Weekly PEM meeting

  • 2019/10/29(Tue) 16:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

Agenda

  • General issue
    • Interferometer status
      • We tried to lock the FPMI now, there is a problem in the hand-off from the green to IR main laser
      • Several morning runs were held (Ex: 17th October).
      • See the detail in url

      • Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection

  • PTEP paper
    • [kagra 03133]
    • KAGRA Overview papers
    • Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality
  • Next F2F meeting
    • RESCEU
    • 4th and 5th Dec., 2019
    • 1slot Washimi-san will have a talk
    • If you plan to write master/doctor thesis, please let me know
  • Chrome Book project (Portable PEM researcher)
  • PEM injection
    • Shaker injection1 (TTanaka, Yokozawa)
    • Shaker injection2 (Okutomi, Fabian)
    • acoustic injection (TTanaka, Yokozawa)
    • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
    • RF injection (TTanaka, Washimi)
  • Weekly PEM measurement
    • Friday is weekly PEM measurement
    • Understanding the effect of the instruments, search the origin of noise, and so on
    • Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz)
    • Database for the KAGRA characteristic lines
    • Visitors from LV
      • Anamaria from Livingston : 18 - 29 Nov.
      • Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
  • Each progress
    • Yokozawa
      • Current serious noises
        • 18V DC noises
        • Coherent with ITMX MN YAW
        • Coherence with ITMY TM PIT
      • Daily summary page
    • Washimi
    • Sugimoto 
      • Virgo visiting report
    • Kozakai
      • Trigger analysis with silent run
    • TTanaka(ICRR)
      • Preparing for the PEM injection
    • Mori, Kaihotsu
      • Cryochamber vibration
    • Fujikawa, Mori
      • fujimopy
      • Line amplitude web page
    • Fujikawa, Washimi
      • Lock loss study
    • TTanaka(Niigata)
      • Preparation of the coil
      • 24Hz noise situation
    • Yamamoto
    • etc
  • github progress
    • GitHub.png

KAGRA/Subgroups/PEM/Meeting/191029/Agenda (last edited 2019-10-29 16:31:49 by yukino.mori)