Size: 3112
Comment:
|
Size: 3023
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 62: | Line 62: |
* New magnetometer channels * K1:PEM-MAG_SR_BOOTH_SR_(X/Y/Z)_OUT_DQ * K1:PEM-MAG_IYC_FIELD_IYC_(X/Y/Z)_OUT_DQ * Coherent analysis for the FPMI, MICH and SRCL |
* Current serious noises * 18V DC noises * Coherent with ITMX MN YAW * Coherence with ITMY TM PIT |
Line 68: | Line 68: |
* (Washimi), Sugimoto | * Washimi * * Sugimoto |
Line 74: | Line 77: |
* TTanaka | * TTanaka(ICRR) |
Line 77: | Line 80: |
* TTanaka, Kaihotsu * Magnetic field around BS area[[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10967|klog10967]] * Mori, Yokozawa * Noise search at the IXV area |
* Mori, Kaihotsu * Cryochamber vibration |
Line 91: | Line 90: |
* TTanaka(Niigata) * Preparation of the coil * 24Hz noise situation |
Weekly PEM meeting
- 2019/10/29(Tue) 16:00-(JST)
- Regular meeting meeting
Web meeting with Zoom2 (Zoom2)
Agenda
- General issue
- Interferometer status
- We tried to lock the FPMI now, there is a problem in the hand-off from the green to IR main laser
- Several morning runs were held (Ex: 17th October).
See the detail in url
Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection
- Interferometer status
- PTEP paper
- [kagra 03133]
- KAGRA Overview papers
- Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality
- Next F2F meeting
- RESCEU
- 4th and 5th Dec., 2019
- 1slot
- If you plan to write master/doctor thesis, please let me know
- Chrome Book project (Portable PEM researcher)
http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
- We prepared two PEM Chromebook
- Start writing paper (PTEP?)
- There are many project to collaborate with the instruments
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka, Yokozawa)
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- RF injection (TTanaka, Washimi)
- Weekly PEM measurement
- Friday is weekly PEM measurement
- Understanding the effect of the instruments, search the origin of noise, and so on
- Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz)
- Database for the KAGRA characteristic lines
- Visitors from LV
- Anamaria from Livingston : 18 - 29 Nov.
- Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
- Each progress
- Yokozawa
- Current serious noises
- 18V DC noises
- Coherent with ITMX MN YAW
- Coherence with ITMY TM PIT
- Daily summary page
- Current serious noises
- Washimi
- Sugimoto
- Virgo visiting report
- Kozakai
- Trigger analysis with silent run
- TTanaka(ICRR)
- Preparing for the PEM injection
- Mori, Kaihotsu
- Cryochamber vibration
- Fujikawa, Mori
- fujimopy
- Line amplitude web page
- Fujikawa, Washimi
- Lock loss study
- TTanaka(Niigata)
- Preparation of the coil
- 24Hz noise situation
- Yamamoto
Auto Bruco klog10203
- etc
- Yokozawa
- github progress