Differences between revisions 1 and 2
Revision 1 as of 2019-10-29 15:43:38
Size: 84
Comment:
Revision 2 as of 2019-10-29 16:01:19
Size: 3087
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
 * Attend:  * Attend:Yokozawa, TTanaka, Washimi, Kozakai, Oshino, TTanaka, Ohkawa, Fujikawa

=== Agenda ===
 
 * General issue

  * Interferometer status
   * We tried to lock the FPMI now, there is a problem in the hand-off from the green to IR main laser
   * Several morning runs were held (Ex: 17th October).
   * See the detail in [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/RUN/MORNINGRUN2019|url]]
   * Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection

 * PTEP paper
  * [kagra 03133]
  * KAGRA Overview papers
  * Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality

 * Next F2F meeting
  * RESCEU
  * 4th and 5th Dec., 2019
  * 1slot Washimi-san will have a talk
  * If you plan to write master/doctor thesis, please let me know

 * Chrome Book project (Portable PEM researcher)
  * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
  * We prepared two PEM Chromebook
  * Start writing paper (PTEP?)
  * There are many project to collaborate with the instruments
   * IOO, vibration, sound and magnetometer measurements inside the PSL room [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10173|klog10173]]
   * ALS, the green fiber noise
   * LAS, ISS noise hunting
   * MIF, FPMI displacement
   * VIS, Around the OpLev
   * Wide 44Hz noise -> Vacuum pump?
   * BS

 * PEM injection
  * Shaker injection1 (TTanaka, Yokozawa)
  * Shaker injection2 (Okutomi, Fabian)
  * acoustic injection (TTanaka, Yokozawa)
  * magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
  * RF injection (TTanaka, Washimi)

 * Weekly PEM measurement
  * Friday is weekly PEM measurement
  * Understanding the effect of the instruments, search the origin of noise, and so on
  * Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz)

 * Database for the KAGRA characteristic lines
   * [[https://www.icrr.u-tokyo.ac.jp/~yokozawa/KAGRA_line_database/index.html|url]]

 * Visitors from LV
   * Anamaria from Livingston : 18 - 29 Nov.
   * Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)

 * Each progress

  * Yokozawa
   * Current serious noises
    * 18V DC noises
    * Coherent with ITMX MN YAW
    * Coherence with ITMY TM PIT
   * Daily summary page

  * Washimi
   *

  * Sugimoto 
   * Virgo visiting report

  * Kozakai
   * Trigger analysis with silent run

  * TTanaka(ICRR)
   * Preparing for the PEM injection

  * Mori, Kaihotsu
   * Cryochamber vibration

  * Fujikawa, Mori
   * fujimopy
   * Line amplitude web page

  * Fujikawa, Washimi
   * Lock loss study [[attachment:PEMmtg_191029fuji.pdf]]

  * TTanaka(Niigata)
   * Preparation of the coil
   * 24Hz noise situation

  * Yamamoto
   * Auto Bruco [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10203|klog10203]]

  * etc

 * github progress
  {{attachment:GitHub.png}}

Minute of PEM meeting

  • Date: 2019/10/29 16:00-17:00(JST)
  • Attend:Yokozawa, TTanaka, Washimi, Kozakai, Oshino, TTanaka, Ohkawa, Fujikawa

Agenda

  • General issue
    • Interferometer status
      • We tried to lock the FPMI now, there is a problem in the hand-off from the green to IR main laser
      • Several morning runs were held (Ex: 17th October).
      • See the detail in url

      • Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection

  • PTEP paper
    • [kagra 03133]
    • KAGRA Overview papers
    • Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality
  • Next F2F meeting
    • RESCEU
    • 4th and 5th Dec., 2019
    • 1slot Washimi-san will have a talk
    • If you plan to write master/doctor thesis, please let me know
  • Chrome Book project (Portable PEM researcher)
  • PEM injection
    • Shaker injection1 (TTanaka, Yokozawa)
    • Shaker injection2 (Okutomi, Fabian)
    • acoustic injection (TTanaka, Yokozawa)
    • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
    • RF injection (TTanaka, Washimi)
  • Weekly PEM measurement
    • Friday is weekly PEM measurement
    • Understanding the effect of the instruments, search the origin of noise, and so on
    • Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz)
  • Database for the KAGRA characteristic lines
  • Visitors from LV
    • Anamaria from Livingston : 18 - 29 Nov.
    • Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
  • Each progress
    • Yokozawa
      • Current serious noises
        • 18V DC noises
        • Coherent with ITMX MN YAW
        • Coherence with ITMY TM PIT
      • Daily summary page
    • Washimi
    • Sugimoto 
      • Virgo visiting report
    • Kozakai
      • Trigger analysis with silent run
    • TTanaka(ICRR)
      • Preparing for the PEM injection
    • Mori, Kaihotsu
      • Cryochamber vibration
    • Fujikawa, Mori
      • fujimopy
      • Line amplitude web page
    • Fujikawa, Washimi
    • TTanaka(Niigata)
      • Preparation of the coil
      • 24Hz noise situation
    • Yamamoto
    • etc
  • github progress

KAGRA/Subgroups/PEM/Meeting/191029/Minute (last edited 2019-10-29 16:55:24 by TakaakiYokozawa)