Size: 84
Comment:
|
Size: 3359
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
* Attend: | * Attend:Yokozawa, TTanaka, Washimi, Kozakai, Oshino, TTanaka, Ohkawa, kokeyama, mori, kaihotsu,Fujikawa === Agenda === * General issue * Interferometer status * We tried to lock the FPMI now, there is a problem in the hand-off from the green to IR main laser * Several morning runs were held (Ex: 17th October). * See the detail in [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/DET/RUN/MORNINGRUN2019|url]] * Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection * PTEP paper * [kagra 03133] * KAGRA Overview papers * Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality * Next F2F meeting * RESCEU * 4th and 5th Dec., 2019 * 1slot Washimi-san will have a talk * If you plan to write master/doctor thesis, please let me know * Chrome Book project (Portable PEM researcher) * http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable * We prepared two PEM Chromebook * Start writing paper (PTEP?) * There are many project to collaborate with the instruments * IOO, vibration, sound and magnetometer measurements inside the PSL room [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10173|klog10173]] * ALS, the green fiber noise * LAS, ISS noise hunting * MIF, FPMI displacement * VIS, Around the OpLev * Wide 44Hz noise -> Vacuum pump? * BS * PEM injection * Shaker injection1 (TTanaka, Yokozawa) * Shaker injection2 (Okutomi, Fabian) * acoustic injection (TTanaka, Yokozawa) * magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa) * RF injection (TTanaka, Washimi) * Weekly PEM measurement * Friday is weekly PEM measurement * Understanding the effect of the instruments, search the origin of noise, and so on * Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz) * Database for the KAGRA characteristic lines * [[https://www.icrr.u-tokyo.ac.jp/~yokozawa/KAGRA_line_database/index.html|url]] * Visitors from LV * Anamaria from Livingston : 18 - 29 Nov. * Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ) * Each progress * Yokozawa * Current serious noises * 18V DC noises * Coherent with ITMX MN YAW * Coherence with ITMY TM PIT * Daily summary page * Washimi * Place the temporal accelerometers to the IXC. * We will check the cryocooler at Thursday * 24Hz noise search * Checked the instruments around the IXV area * Time variation at the 4+10n (24,44,...) * Help the Fujikawa analysis * Sugimoto * Virgo visiting report * Kozakai * Trigger analysis with silent run * TTanaka(ICRR) * Preparing for the PEM injection * Mori, Kaihotsu * Cryochamber vibration * Fujikawa, Mori * fujimopy * Line amplitude web page * Fujikawa, Washimi * Lock loss study [[attachment:PEMmtg_191029fuji.pdf]] * TTanaka(Niigata) * Preparation of the coil * 24Hz noise situation * Yamamoto * Auto Bruco [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=10203|klog10203]] * etc * github progress {{attachment:GitHub.png}} |
Minute of PEM meeting
- Date: 2019/10/29 16:00-17:00(JST)
- Attend:Yokozawa, TTanaka, Washimi, Kozakai, Oshino, TTanaka, Ohkawa, kokeyama, mori, kaihotsu,Fujikawa
Agenda
- General issue
- Interferometer status
- We tried to lock the FPMI now, there is a problem in the hand-off from the green to IR main laser
- Several morning runs were held (Ex: 17th October).
See the detail in url
Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection
- Interferometer status
- PTEP paper
- [kagra 03133]
- KAGRA Overview papers
- Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality
- Next F2F meeting
- RESCEU
- 4th and 5th Dec., 2019
- 1slot Washimi-san will have a talk
- If you plan to write master/doctor thesis, please let me know
- Chrome Book project (Portable PEM researcher)
http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Portable
- We prepared two PEM Chromebook
- Start writing paper (PTEP?)
- There are many project to collaborate with the instruments
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Shaker injection2 (Okutomi, Fabian)
- acoustic injection (TTanaka, Yokozawa)
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- RF injection (TTanaka, Washimi)
- Weekly PEM measurement
- Friday is weekly PEM measurement
- Understanding the effect of the instruments, search the origin of noise, and so on
- Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz)
- Database for the KAGRA characteristic lines
- Visitors from LV
- Anamaria from Livingston : 18 - 29 Nov.
- Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
- Each progress
- Yokozawa
- Current serious noises
- 18V DC noises
- Coherent with ITMX MN YAW
- Coherence with ITMY TM PIT
- Daily summary page
- Current serious noises
- Washimi
- Place the temporal accelerometers to the IXC.
- We will check the cryocooler at Thursday
- 24Hz noise search
- Checked the instruments around the IXV area
- Time variation at the 4+10n (24,44,...)
- Help the Fujikawa analysis
- Sugimoto
- Virgo visiting report
- Kozakai
- Trigger analysis with silent run
- TTanaka(ICRR)
- Preparing for the PEM injection
- Mori, Kaihotsu
- Cryochamber vibration
- Fujikawa, Mori
- fujimopy
- Line amplitude web page
- Fujikawa, Washimi
Lock loss study PEMmtg_191029fuji.pdf
- TTanaka(Niigata)
- Preparation of the coil
- 24Hz noise situation
- Yamamoto
Auto Bruco klog10203
- etc
- Yokozawa
- github progress