Differences between revisions 1 and 15 (spanning 14 versions)
Revision 1 as of 2019-11-09 03:45:39
Size: 3167
Comment:
Revision 15 as of 2019-11-12 16:58:16
Size: 3372
Editor: yukino.mori
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2019/11/05(Tue) 17:00-(JST)  * 2019/11/12(Tue) 17:00-(JST)
Line 10: Line 10:
  * Meeting time
   * 17:00-18:00 -> 16:00-18:00
    * Increase the discussion item
    * Conflict with CRY meeting(?)
Line 11: Line 16:
   * Now, we can lock the interferometer stably
   * ISS(Intensity Stabilization System) was implemented, better sensitivity
   * We are fixing the ALS(Arm Length Stabilization system) problem.
Line 27: Line 31:
   * TTanaka
Line 35: Line 40:
  * Shaker injection2 (Okutomi, Fabian)
Line 38: Line 42:
  * RF injection (TTanaka, Washimi)
Line 41: Line 44:
  * Friday is weekly PEM measurement   * Friday (+every morning) is weekly PEM measurement
Line 43: Line 46:
  * Tentative : New vacuum pump, 18V DC noise(24Hz), Cryochamber vibration(46Hz), FFU, Noise search   * Tentative : 18V DC noise(24Hz), Cryochamber vibration, Air compressors, FFU, Cooler, Noise search
Line 46: Line 49:
  * [[https://www.icrr.u-tokyo.ac.jp/~yokozawa/KAGRA_line_database/index.html|url]]   * [[https://www.icrr.u-tokyo.ac.jp/~yokozawa/KAGRA_line_database/index.html|url]]
  * Fixed bugs
Line 50: Line 54:
   * Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/18-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)

* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/191126/Agenda|LVK PEM meeting (11/26)]]
   * Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/26-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/191126/Agenda|LVK PEM meeting (11/26)]]
   * Fujikawa, TNTanaka 11/24-12/3
Line 59: Line 62:
    * 24Hz noise (100V AC + AA?)
Line 61: Line 63:
    * Coherent with ITMX MN YAW
    * Coherence with ITMY TM PIT
    * ACC ground loop problem
    * New accelerometers for noise search
    * Lock state vs EXC magnetometer
Line 66: Line 69:
   * Summary of coherence study between PEMs and DARM displacement ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10923|pdf]])

  * Washimi, Yamada, TTanaka
   * IXC vibration Yamada ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10925|pdf]])
   * IXC Air compressor (+TNTanaka) [[attachment:washimi_CRYmeeting_20191111.pdf]] [[attachment:TNT.pdf]]
   * KamioKaminari update [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/KamioKaminari/]]
   * PEM map update [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/]]
   * Slow monitor page [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/SEM/]]
Line 74: Line 77:
  * TTanaka(ICRR), Washimi, TTanaka(Niigata), Yamada
   * Acoustic injection with FPMI
  * TTanaka(ICRR)
   * Acoustic injection with FPMI (+ Washimi, Yamada, TNTanaka)
Line 78: Line 81:
   * Vacuum pump vibration[[attachment:StopVacuumePump.pdf]]    * Vacuum pump vibration [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10949|JGW-G1910949]]
Line 81: Line 84:
   * fujimopy [[attachment:PEMmtg_191105fmpy.pdf]]    * fujimopy
Line 84: Line 87:
  * Fujikawa, Washimi
   * Lock loss study [[attachment:PEMmtg_191105lock.pdf]]
  * Fujikawa
   * Lock loss study [[attachment:PEMmtg_191112lock-2.pdf]]
Line 89: Line 92:
   * 24Hz noise situation    * IXC compressor study

  * Yamamoto, Yuzu, Andrew
   * Pastavi

Weekly PEM meeting

  • 2019/11/12(Tue) 17:00-(JST)
  • Regular meeting meeting
  • Web meeting with Zoom2 (Zoom2)

Agenda

  • General issue
    • Meeting time
      • 17:00-18:00 -> 16:00-18:00

        • Increase the discussion item
        • Conflict with CRY meeting(?)
    • Interferometer status
      • We are fixing the ALS(Arm Length Stabilization system) problem.
      • Long silent run at 2nd Nobember (klog11312)

      • See the detail in url

      • Silent run -> Some excitation(including calibration line) -> PEM injection -> Hardware injection

  • PTEP paper
    • [kagra 03133]
    • KAGRA Overview papers
    • Overview of KAGRA : (3) Detchar, calibration, physical environment, data quality
  • Next F2F meeting
    • RESCEU
    • 4th and 5th Dec., 2019
    • 1 slot Washimi-san will have a talk
    • If you plan to write master/doctor thesis, please let me know
      • TTanaka
  • Chrome Book project (Portable PEM researcher)
  • PEM injection
    • Shaker injection1 (TTanaka, Yokozawa)
    • acoustic injection (TTanaka, Yokozawa)
    • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
  • Weekly PEM measurement
    • Friday (+every morning) is weekly PEM measurement
    • Understanding the effect of the instruments, search the origin of noise, and so on
    • Tentative : 18V DC noise(24Hz), Cryochamber vibration, Air compressors, FFU, Cooler, Noise search
  • Database for the KAGRA characteristic lines
    • url

    • Fixed bugs
  • Visitors from LV
    • Anamaria from Livingston : 18 - 29 Nov.
    • Federico, Irene, Camilla (input optics) + Francesca from Virgo : 11/26-12/7 (2 weeks@KAGRA, 1 weeks@NAOJ)
    • Fujikawa, TNTanaka 11/24-12/3
  • Each progress

KAGRA/Subgroups/PEM/Meeting/191112/Agenda (last edited 2019-11-13 10:32:55 by taiki.tanaka)