Size: 631
Comment:
|
Size: 612
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 9: | Line 9: |
* Reports of October Commissioning Break * LIGO PEM report (Anamaria) < 20min > * Virgo ENV report (Irene) < 20min > |
* Reports of October Commissioning Break -> Other time-slot? * LIGO --(PEM)-- report (Anamaria) * Virgo --(ENV)-- report (Irene) |
Line 14: | Line 14: |
* KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa) < 20min > * Targets of Enviromental noise in KAGRA before O3 joining (Washimi) < 20min > * Status of the PEM injection in KAGRA (TTanaka) < 20min > |
* KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa) * Targets of Enviromental noise in KAGRA before O3 joining (Washimi) * Status of the PEM injection in KAGRA (TTanaka) |
LVK PEM meeting
- 2019/11/26(Thu) 16:00-18:00(JST) 8:00-10:00(CEST) 23:00-1:00(PST) 1:00-3:00(CST)
- at 2F meeting room
Zoom2 : https://zoom.us/j/6676627462
- Denner (after the meeting)
=== Agenda ===
Reports of October Commissioning Break -> Other time-slot?
LIGO PEM report (Anamaria)
Virgo ENV report (Irene)
- KAGRA PEM reports
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
- Targets of Enviromental noise in KAGRA before O3 joining (Washimi)
- Status of the PEM injection in KAGRA (TTanaka)