Differences between revisions 2 and 3
Revision 2 as of 2019-12-11 15:49:15
Size: 2961
Comment:
Revision 3 as of 2019-12-11 16:03:25
Size: 3020
Comment:
Deletions are marked like this. Additions are marked like this.
Line 7: Line 7:
Kamioka : Kamioka : Ohkawa, Washimi, Kozakai, Oshino, TTanaka, TTanaka(Niigata)

Weekly PEM meeting

  • 2019/12/1(Wed) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Kamioka : Ohkawa, Washimi, Kozakai, Oshino, TTanaka, TTanaka(Niigata)

Agenda

General issue

  • General issue
    • Interferometer status
      • Detection range is about 40kpc at maximum
      • There is still some peaks in the lower frequency
      • Mostly AS PD noise at higher frequency
      • Peaks appeared at higher frequency
      • December 17-24 24h engineering run
    • PEM festival
      • 12/13(Fri) 9:00-17:00
        • Vibration injection to PSL, REFL and AS table
        • Vibration to IXC and IYC
      • 12/20(Fri)
        • No PEM work
      • 12/24(Tue)
        • FFU, cooler, vacuum pump turned off
    • Conference
      • JPS (2010/3/16-19 @ Nagoya)
        • Yokozawa, TTanaka
    • PEM injection
      • Shaker injection1 (TTanaka, Yokozawa)
        • Where is the PZT shaker driver?
        • Acoustic injection -> Shaker injection

      • Shaker injection2 (Washimi, Camilla)
        • Bluetooth shaker + Chromebook
        • optical table, oplev, ...
      • acoustic injection (TTanaka, Yokozawa)
        • PSL, REFL and AS table injection
        • Analysis is ongoing
      • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
        • Effect of the air cooler magnetic field
        • AS, REFL table injection
    • Newtonian noise measurement
      • Thank you for Virgo PEM member!
      • Francesca mainly measured the newtonian noise
    • PEM measurement
      • Sunday morning : PEM injection
      • 10th Dec. : Xend environmental check
      • Someday : Effect of the sound to DARM displacement
      • Someday : Environmental check around BS (including the POP)
      • Someday : Evaluation of the table cover
      • Someday : SR2 and SR3 optical lever (Reflection light from SRM?)
    • Visitors from LV
      • Adam, Sheila (-12/13)
      • Camilla (-12/20)
  • Each progress
    • Yokozawa
      • Short report about newtonian noise measurement(Virgo PEM effort)
      • Short report about jitter noise at PSL room(Camilla effort)
      • Current serious noises
    • Washimi
      • Lockloss study link

      • Volt monitor for the optical table link

      • update of PEM map link

      • Polish-up of Acuostic reverberation time (on-going)
    • Kozakai
      • Trigger analysis with silent run
    • TTanaka(ICRR)
      • Acoustic injection with FPMI
    • Fujikawa
    • TTanaka(Niigata)
      • Magnetic field from air cooler and compressor
      • Magnetic field injection to AS and REFL table
    • etc

KAGRA/Subgroups/PEM/Meeting/191210/Minute (last edited 2019-12-11 16:03:25 by TakaakiYokozawa)