Differences between revisions 1 and 3 (spanning 2 versions)
Revision 1 as of 2019-12-16 07:19:03
Size: 2955
Comment:
Revision 3 as of 2019-12-16 07:23:12
Size: 2958
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
 * General issue ==== General issue ====
Line 5: Line 5:
  * Interferometer status
  * Detection range is about 40kpc at maximum
   * There is still some peaks in the lower frequency
  * Type-A resonant frequency etc...
   * Mostly AS PD noise at higher frequency
  * PRFPMI trial at end of this year
   * Peaks appeared at higher frequency
  * PEM injection to REFL table
  * December 17-24 24h engineering run
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/ | wiki]]
    * We couldn't touch the interferometer during this period
 * Interferometer status
  * Detection range is about 40kpc at maximum
  * There is still some peaks in the lower frequency
   * Type-A resonant frequency etc...
  * Mostly AS PD noise at higher frequency
   * PRFPMI trial at end of this year
  * Peaks appeared at higher frequency
   * PEM injection to REFL table
  * December 17-24 24h engineering run
   * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/ | wiki]]
   * We couldn't touch the interferometer during this period
Line 18: Line 18:
   * 12/13(Fri) 9:00-17:00    * 12/15(Fri) 9:00-15:00 (Done)

Agenda

General issue

  • Interferometer status
    • Detection range is about 40kpc at maximum
    • There is still some peaks in the lower frequency
      • Type-A resonant frequency etc...
    • Mostly AS PD noise at higher frequency
      • PRFPMI trial at end of this year
    • Peaks appeared at higher frequency
      • PEM injection to REFL table
    • December 17-24 24h engineering run
      • wiki

      • We couldn't touch the interferometer during this period
    • PEM festival
      • 12/15(Fri) 9:00-15:00 (Done)
        • Vibration injection to PSL, REFL and AS table
        • Vibration to IXC and IYC
      • 12/20(Fri)
        • No PEM work
      • 12/24(Tue)
        • FFU, cooler, vacuum pump turned off
    • Conference
      • JPS (2010/3/16-19 @ Nagoya)
        • Yokozawa, TTanaka
    • PEM injection
      • Shaker injection1 (TTanaka, Yokozawa)
        • Where is the PZT shaker driver?
        • Acoustic injection -> Shaker injection

      • Shaker injection2 (Washimi, Camilla)
        • Bluetooth shaker + Chromebook
        • optical table, oplev, ...
      • acoustic injection (TTanaka, Yokozawa)
        • PSL, REFL and AS table injection
        • Analysis is ongoing
      • magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
        • Effect of the air cooler magnetic field
        • AS, REFL table injection
    • Newtonian noise measurement
      • Thank you for Virgo PEM member!
      • Francesca mainly measured the newtonian noise
    • PEM measurement
      • Sunday morning : PEM injection
      • 10th Dec. : Xend environmental check
      • Someday : Effect of the sound to DARM displacement
      • Someday : Environmental check around BS (including the POP)
      • Someday : Evaluation of the table cover
      • Someday : SR2 and SR3 optical lever (Reflection light from SRM?)
    • Visitors from LV
      • Adam, Sheila (-12/13)
      • Camilla (-12/20)
  • Each progress
    • Yokozawa
      • Short report about newtonian noise measurement(Virgo PEM effort)
      • Short report about jitter noise at PSL room(Camilla effort)
      • Current serious noises
    • Washimi
      • Lockloss study link

      • Volt monitor for the optical table link

      • update of PEM map link

      • Polish-up of Acuostic reverberation time (on-going)
    • Kozakai
      • Trigger analysis with silent run
    • TTanaka(ICRR)
      • Acoustic injection with FPMI pdf

    • Fujikawa
    • TTanaka(Niigata)
      • Magnetic field from air cooler and compressor
      • Magnetic field injection to AS and REFL table
    • etc

KAGRA/Subgroups/PEM/Meeting/191217/Agenda (last edited 2019-12-17 18:37:27 by taiki.tanaka)