Size: 2955
Comment:
|
Size: 2602
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== Weekly PEM meeting == * 2019/12/17(Tue) 16:00-(JST) * Regular meeting meeting (Japanese) * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) |
|
Line 3: | Line 10: |
* General issue | ==== General issue ==== |
Line 5: | Line 12: |
* Interferometer status * Detection range is about 40kpc at maximum * There is still some peaks in the lower frequency * Type-A resonant frequency etc... * Mostly AS PD noise at higher frequency * PRFPMI trial at end of this year * Peaks appeared at higher frequency * PEM injection to REFL table * December 17-24 24h engineering run * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/ | wiki]] * We couldn't touch the interferometer during this period |
* Interferometer status * Detection range is about 40kpc at maximum * There is still some peaks in the lower frequency * Type-A resonant frequency etc... * Mostly AS PD noise at higher frequency * PRFPMI trial at end of this year * Peaks appeared at higher frequency * PEM injection to REFL table * December 17-24 24h engineering run * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/EngineeringRun/ER191217_24/ | wiki]] * We couldn't touch the interferometer during this period |
Line 17: | Line 24: |
* PEM festival * 12/13(Fri) 9:00-17:00 * Vibration injection to PSL, REFL and AS table * Vibration to IXC and IYC * 12/20(Fri) * No PEM work * 12/24(Tue) * FFU, cooler, vacuum pump turned off |
* PEM festival * 12/15(Fri) 9:00-15:00 (Done) * Vibration injection to PSL, REFL and AS table * Vibration to IXC and IYC * 12/20(Fri) * No PEM work * 12/24(Tue) * Post engineering run : FFU, cooler, vacuum pump turned off |
Line 26: | Line 33: |
* Conference * JPS (2010/3/16-19 @ Nagoya) * Yokozawa, TTanaka * KIW7 * PEM injection * Shaker injection1 (TTanaka, Yokozawa) * Where is the PZT shaker driver? * Acoustic injection -> Shaker injection * Shaker injection2 (Washimi, Camilla) * Bluetooth shaker + Chromebook * optical table, oplev, ... * acoustic injection (TTanaka, Yokozawa) * PSL, REFL and AS table injection * Analysis is ongoing * magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa) * Effect of the air cooler magnetic field * AS, REFL table injection * Newtonian noise measurement * Thank you for Virgo PEM member! * Francesca mainly measured the newtonian noise * PEM measurement * Sunday morning : PEM injection * Someday : Effect of the sound to DARM displacement * Someday : Environmental check around BS (including the POP) * Someday : Evaluation of the table cover * Someday : SR2 and SR3 optical lever (Reflection light from SRM?) * Visitors from LV * Camilla (-12/20) |
|
Line 27: | Line 66: |
* Conference * JPS (2010/3/16-19 @ Nagoya) * Yokozawa, TTanaka |
==== Each progress ==== |
Line 31: | Line 68: |
* PEM injection * Shaker injection1 (TTanaka, Yokozawa) * Where is the PZT shaker driver? * Acoustic injection -> Shaker injection * Shaker injection2 (Washimi, Camilla) * Bluetooth shaker + Chromebook * optical table, oplev, ... * acoustic injection (TTanaka, Yokozawa) * PSL, REFL and AS table injection * Analysis is ongoing * magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa) * Effect of the air cooler magnetic field * AS, REFL table injection |
* Yokozawa * Todo list toward joining O3 * Current serious noises |
Line 45: | Line 72: |
* Newtonian noise measurement * Thank you for Virgo PEM member! * Francesca mainly measured the newtonian noise |
* Washimi * Lockloss study * Shaker injection to PSL room (with Camilla) |
Line 49: | Line 76: |
* PEM measurement * Sunday morning : PEM injection * 10th Dec. : Xend environmental check * Someday : Effect of the sound to DARM displacement * Someday : Environmental check around BS (including the POP) * Someday : Evaluation of the table cover * Someday : SR2 and SR3 optical lever (Reflection light from SRM?) |
* Kozakai * Trigger analysis with silent run |
Line 57: | Line 79: |
* Visitors from LV * Adam, Sheila (-12/13) * Camilla (-12/20) * Each progress |
* TTanaka(ICRR) * Acoustic injection with FPMI |
Line 63: | Line 82: |
* Yokozawa * Short report about newtonian noise measurement(Virgo PEM effort) * Short report about jitter noise at PSL room(Camilla effort) * Current serious noises |
* Fujikawa * Lock loss study [[attachment:PEMmtg_191217lock.pdf]] * fujimopy [[attachment:PEMmtg_191217fmpy.pdf]] |
Line 68: | Line 86: |
* Washimi * Lockloss study [[http://10.68.10.87/~controls/washimi/LockLossStudy/|link]] * Volt monitor for the optical table [[https://github.com/gw-pem/kagra-pem/issues/198|link]] * update of [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/|PEM map]] [[https://github.com/gw-pem/kagra-pem/issues/195|link]] * Polish-up of Acuostic reverberation time (on-going) |
* TTanaka(Niigata) * Magnetic field from air cooler and compressor * Magnetic field injection to AS and REFL table |
Line 74: | Line 90: |
* Kozakai * Trigger analysis with silent run * TTanaka(ICRR) * Acoustic injection with FPMI [[attachment:191211.pdf|pdf]] * Fujikawa * Lock loss study [[attachment:FujikawaMTG_191211.pdf]] * fujimopy [[attachment:PEMmtg_191211lock.pdf]] * TTanaka(Niigata) * Magnetic field from air cooler and compressor * Magnetic field injection to AS and REFL table * etc |
* etc |
Weekly PEM meeting
- 2019/12/17(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Detection range is about 40kpc at maximum
- There is still some peaks in the lower frequency
- Type-A resonant frequency etc...
- Mostly AS PD noise at higher frequency
- PRFPMI trial at end of this year
- Peaks appeared at higher frequency
- PEM injection to REFL table
- December 17-24 24h engineering run
- We couldn't touch the interferometer during this period
- PEM festival
- 12/15(Fri) 9:00-15:00 (Done)
- Vibration injection to PSL, REFL and AS table
- Vibration to IXC and IYC
- 12/20(Fri)
- No PEM work
- 12/24(Tue)
- Post engineering run : FFU, cooler, vacuum pump turned off
- 12/15(Fri) 9:00-15:00 (Done)
- Conference
- JPS (2010/3/16-19 @ Nagoya)
- Yokozawa, TTanaka
- KIW7
- JPS (2010/3/16-19 @ Nagoya)
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Where is the PZT shaker driver?
Acoustic injection -> Shaker injection
- Shaker injection2 (Washimi, Camilla)
- Bluetooth shaker + Chromebook
- optical table, oplev, ...
- acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection
- Analysis is ongoing
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- Shaker injection1 (TTanaka, Yokozawa)
- Newtonian noise measurement
- Thank you for Virgo PEM member!
- Francesca mainly measured the newtonian noise
- PEM measurement
- Sunday morning : PEM injection
- Someday : Effect of the sound to DARM displacement
- Someday : Environmental check around BS (including the POP)
- Someday : Evaluation of the table cover
- Someday : SR2 and SR3 optical lever (Reflection light from SRM?)
- Visitors from LV
- Camilla (-12/20)
Each progress
- Yokozawa
- Todo list toward joining O3
- Current serious noises
- Washimi
- Lockloss study
- Shaker injection to PSL room (with Camilla)
- Kozakai
- Trigger analysis with silent run
- TTanaka(ICRR)
- Acoustic injection with FPMI
- Fujikawa
Lock loss study PEMmtg_191217lock.pdf
fujimopy PEMmtg_191217fmpy.pdf
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc