Weekly PEM meeting
- 2020/01/06(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- December 17-24 24h engineering run
- We also held the post ER. We turned off the FFUs and vacuum pumps
- Lock acquisition to PRFPMI
- There is still some peaks in the lower frequency
- Type-A resonant frequency etc...
- Peaks appeared at higher frequency
- PEM injection to REFL table
- Until Jan. 13th, ASC and lock trial of the PRFPMI will be higher priority
- After that, we will move to noise hunting
~100Hz noise and line noise of the higher frequency -> PEM
- December 17-24 24h engineering run
- PEM festival
- This week(Friday?)
- Evaluate the optical levers
Check OpLev cover is enough for O3 or not
- Resonant frequency
- Evaluate the optical levers
- 01/14(Tue) 9:00-15:00
- Evaluate the scattered light for payload (with CRY team)
- 01/15(Wed) ??
- Turned off almost all FFUs and vacuum pumps
- This week(Friday?)
- Conference
- JPS (2010/3/16-19 @ Nagoya)
- Yokozawa, TTanaka
- KIW7
- JPS (2010/3/16-19 @ Nagoya)
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Where is the PZT shaker driver?
Acoustic injection -> Shaker injection
- Shaker injection2 (Washimi, Camilla)
- Bluetooth shaker + Chromebook
- optical table, oplev, ...
- acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection
- Analysis is ongoing
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- Shaker injection1 (TTanaka, Yokozawa)
- Newtonian noise measurement
- Thank you for Virgo PEM member!
- Francesca mainly measured the newtonian noise
- We will discuss in 21st. Jan.(Virgo KAGRA PEM meeting)
- PEM measurement
- Someday : Effect of the sound to DARM displacement
- Someday : Environmental check around BS (including the POP)
- Someday : Evaluation of the table cover
- Someday : SR2 and SR3 optical lever (Reflection light from SRM?)
Each progress
- Yokozawa
- Suspension resonant frequency (with CRY and VIS team)
- Post ER report1
- Planning toward the O3 run
- Washimi
- Lockloss study1
- Shaker injection to PSL room (with Camilla)
- Beam jitter study (Follow Camilla study, reported by Yokozawa?)
- Sound reverberation study
- Kozakai
- Trigger analysis with ER run for the part of the PEM
- Offline detchar report for the part of the PEM
- TTanaka(ICRR)
- shaker injection with FPMI
- Fujikawa
- Lock loss study2
- fujimopy
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc