Size: 3670
Comment:
|
Size: 4065
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 37: | Line 37: |
---- /!\ '''Edit conflict - other version:''' ---- |
|
Line 40: | Line 42: |
---- /!\ '''Edit conflict - your version:''' ---- ---- /!\ '''End of edit conflict''' ---- |
|
Line 46: | Line 52: |
* Evaluate the scattered light for payload (with CRY team) | * Evaluate the scattered light for payload (with CRY team) [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12293]] |
Line 51: | Line 57: |
* JPS (2010/3/16-19 @ Nagoya) | * [[https://sites.google.com/view/ugapw2020/home|地下宇宙若手研究会]] (2/22-24) * JPS (2020/3/16-19 @ Nagoya) |
Line 60: | Line 67: |
* Bluetooth shaker + Chromebook | * Bluetooth shaker + Chromebook [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12187]] |
Line 88: | Line 95: |
* Lockloss study1 * Shaker injection to PSL room (with Camilla) |
* post ER [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11165|JGW-G2011165]] |
Line 91: | Line 97: |
* Sound reverberation study | * Sound reverberation study (KAGRA & Virgo) |
Weekly PEM meeting
- 2020/01/06(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- December 17-24 24h engineering run
- We also held the post ER. We turned off the FFUs and vacuum pumps
- Lock acquisition to PRFPMI
- There is still some peaks in the lower frequency
- Type-A resonant frequency etc...
- Peaks appeared at higher frequency
- PEM injection to REFL table
- Until Jan. 13th, ASC and lock trial of the PRFPMI will be higher priority
- After that, we will move to noise hunting
~100Hz noise and line noise of the higher frequency -> PEM
- December 17-24 24h engineering run
- PEM plan January
- Identification of the =100Hz noise source
- (Maybe, ) the dominant noise for lower frequency may come from suspension
- After the success of the PRFPMI (or chance to operate the FPMI), we would like to do following things
- Jitter noise analysis
- Camilla and Washimi-san evaluated the jitter noise at PSL room, but two order lower than current noise
- But, we don't know the higher frequency
- Understanding the coupling function detected at the refl table
- At the some point, we detected the larger coupling function
- Periscope or some optics?
- We would like to inject sound or vibration to AS, POP and TMS table
- Long term PEM evaluation
- Jitter noise analysis
- Identification of the =100Hz noise source
Edit conflict - other version:
- ICRR Kyodo-riyo
- Yokozawa and Washimi-san prepared
Edit conflict - your version:
End of edit conflict
- PEM festival
- This week(Friday?)
- Evaluate the optical levers
Check OpLev cover is enough for O3 or not
- Resonant frequency
- Evaluate the optical levers
- 01/14(Tue) 9:00-15:00
Evaluate the scattered light for payload (with CRY team) http://klog.icrr.u-tokyo.ac.jp/osl/?r=12293
- 01/15(Wed) ??
- Turned off almost all FFUs and vacuum pumps
- This week(Friday?)
- Conference
地下宇宙若手研究会 (2/22-24)
- JPS (2020/3/16-19 @ Nagoya)
- Yokozawa, TTanaka
- KIW7
- PEM injection
- Shaker injection1 (TTanaka, Yokozawa)
- Where is the PZT shaker driver?
Acoustic injection -> Shaker injection
- Shaker injection2 (Washimi, Camilla)
Bluetooth shaker + Chromebook http://klog.icrr.u-tokyo.ac.jp/osl/?r=12187
- optical table, oplev, ...
- acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection
- Analysis is ongoing
- magnetic field injection (Niigata Tanaka, Fujikawa, Yokozawa)
- Effect of the air cooler magnetic field
- AS, REFL table injection
- Shaker injection1 (TTanaka, Yokozawa)
- Newtonian noise measurement
- Thank you for Virgo PEM member!
- Francesca mainly measured the newtonian noise
- We will discuss in 21st. Jan.(Virgo KAGRA PEM meeting)
- PEM measurement
- Someday : Effect of the sound to DARM displacement
- Someday : Environmental check around BS (including the POP)
- Someday : Evaluation of the table cover
- Someday : SR2 and SR3 optical lever (Reflection light from SRM?)
Each progress
- Yokozawa
- Suspension resonant frequency (with CRY and VIS team)
- Post ER report1
- Planning toward the O3 run
- Washimi
post ER JGW-G2011165
- Beam jitter study (Follow Camilla study, reported by Yokozawa?)
Sound reverberation study (KAGRA & Virgo)
- Kozakai
- Trigger analysis with ER run for the part of the PEM
- Offline detchar report for the part of the PEM
- TTanaka(ICRR)
- shaker injection with FPMI
- Fujikawa
- Lock loss study2
- fujimopy
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc