Size: 19
Comment:
|
Size: 425
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
== KAGRA PEM meeting focused on the Hammering test in Y-end Cryostat & Beamduct == * 2020/'''01/21(The) 17:00-18:00(JST)''' * Zoom2 : https://zoom.us/j/6676627462 |
|
Line 2: | Line 5: |
=== Agenda === | |
Line 3: | Line 7: |
reverberation | * Prepairation of hardware and analysis (Washimi) * Opinion from CRY (Kimura, Ushiba, Yamada?) * Opinion from AOS (Akutsu) * (Opinion from IFO) * (Opinion from VIS) * ... * Disucussion about othre place (OpLev, table, ...) |
KAGRA PEM meeting focused on the Hammering test in Y-end Cryostat & Beamduct
2020/01/21(The) 17:00-18:00(JST)
Zoom2 : https://zoom.us/j/6676627462
Agenda
- Prepairation of hardware and analysis (Washimi)
- Opinion from CRY (Kimura, Ushiba, Yamada?)
- Opinion from AOS (Akutsu)
- (Opinion from IFO)
- (Opinion from VIS)
- ...
Disucussion about othre place (OpLev, table, ...)