Differences between revisions 1 and 7 (spanning 6 versions)
Revision 1 as of 2020-01-14 06:14:15
Size: 19
Comment:
Revision 7 as of 2020-01-15 09:50:48
Size: 425
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
== KAGRA PEM meeting focused on the Hammering test in Y-end Cryostat & Beamduct ==
 * 2020/'''01/21(The) 17:00-18:00(JST)'''
 * Zoom2 : https://zoom.us/j/6676627462
Line 2: Line 5:
=== Agenda ===
Line 3: Line 7:
reverberation  * Prepairation of hardware and analysis (Washimi)
 * Opinion from CRY (Kimura, Ushiba, Yamada?)
 * Opinion from AOS (Akutsu)
 * (Opinion from IFO)
 * (Opinion from VIS)
 * ...
 * Disucussion about othre place (OpLev, table, ...)

KAGRA PEM meeting focused on the Hammering test in Y-end Cryostat & Beamduct

Agenda

  • Prepairation of hardware and analysis (Washimi)
  • Opinion from CRY (Kimura, Ushiba, Yamada?)
  • Opinion from AOS (Akutsu)
  • (Opinion from IFO)
  • (Opinion from VIS)
  • ...
  • Disucussion about othre place (OpLev, table, ...)

KAGRA/Subgroups/PEM/Meeting/200121/Agenda (last edited 2020-01-21 15:31:10 by tatsuki.washimi)