⇤ ← Revision 1 as of 2020-01-22 16:54:10
Size: 140
Comment:
|
← Revision 2 as of 2020-01-22 19:01:51 ⇥
Size: 683
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* Attendance: | * Attendance: Yokozawa, Fujikawa, Irene, Washimi, Federico, Ohkawa, Francesca, Kozakai, TTanaka, Oshino |
Line 7: | Line 7: |
* Join : | |
Line 10: | Line 10: |
* NEB analysis * クラッカー signal was saturated * Washimi microphone was slightly saturated * CEB analysis * Washimi-san couldn't open the frame file -> reproduce again * Confirmed the place of the microphone * Analysis algorithm * Apply the high pass filter and set the threshold * Check the saturation * Set the off data and t0 time * SNR threshold set to 3 * time sliding deviation and mean, new fitting program * |
Minute of PEM meeting
- Date: 2020/01/22 17:00-18:00(JST)
- Attendance: Yokozawa, Fujikawa, Irene, Washimi, Federico, Ohkawa, Francesca, Kozakai, TTanaka, Oshino
- English meeting
Agenda
- NEB analysis
- クラッカー signal was saturated
- Washimi microphone was slightly saturated
- CEB analysis
Washimi-san couldn't open the frame file -> reproduce again
- Confirmed the place of the microphone
- Analysis algorithm
- Apply the high pass filter and set the threshold
- Check the saturation
- Set the off data and t0 time
- SNR threshold set to 3
- time sliding deviation and mean, new fitting program