Size: 2235
Comment:
|
Size: 2186
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 44: | Line 44: |
* Noise around 100Hz @ ER3 [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12629|klog12629]] | * SEM update [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/]] * PEM MAP update [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/]] |
Line 46: | Line 47: |
* PEM chassis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11425|JGW-T2011425]] |
Weekly PEM meeting
- 2020/02/04(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Finally, we can lock the PRFPMI
- OMC DC control, ASC
- Finally, we can lock the PRFPMI
- PEM plan
- PEM injection
- Shaker injection (TTanaka, Yokozawa)
- Acoustic injection (TTanaka, Yokozawa)
- PSL, REFL and AS table injection again
- Hammering test
Hammering test @ Y-end : around 2/15 (JGW-G2011419)
- Long term PEM evaluation
- Turning off the instruments is ongoing, we will continue to this weekend
- Many microphone in the PSL room(after checking the noise at higher frequency)
- PEM injection
- Conference
Each progress
- Yokozawa
- Planning toward the O3 run
- IX. IY microphone
- Instrument switch off
- Washimi
SEM update https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/
PEM MAP update https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/
Portable PEM with DataLogger GutHub201
- Kozakai
Coupling with calibration line @ ER3 slides
- TTanaka(ICRR)
- shaker injection with FPMI
Master thesis JGW-G1910387
- Fujikawa
- Lock loss study
- TTanaka(Niigata)
- Magnetic field from air cooler and compressor
- Magnetic field injection to AS and REFL table
- etc