Differences between revisions 1 and 4 (spanning 3 versions)
Revision 1 as of 2020-02-03 09:58:37
Size: 2235
Comment:
Revision 4 as of 2020-02-04 06:47:37
Size: 1803
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
  * Finally, we can lock the PRFPMI
   * OMC DC control, ASC
  * Finally, we can lock the PRFPMI with OMC DC [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12763|klog12763]]
   * ASC and noise hunting
   * Suspension control
   * Lock loss study
Line 15: Line 17:
 * PEM plan  * PEM plan remaining two weeks
Line 17: Line 19:
    * Shaker injection (TTanaka, Yokozawa)
    *
Acoustic injection (TTanaka, Yokozawa)
    * Shaker and Acoustic injection
Line 23: Line 24:
  * Long term PEM evaluation
  * Turning off the instruments is ongoing, we will continue to this weekend
  * Many microphone in the PSL room(after checking the noise at higher frequency)
  * Discussion about the PEM flags
  * Turning off the instruments is ongoing. we will continue to this weekend (It becomes lower priority)
  * Many microphone in the PSL room (Lower priority)
Line 39: Line 40:
  * Planning toward the O3 run
  * IX. IY microphone
  * Instrument switch off
  * What should we do this week
Line 44: Line 43:
  * Noise around 100Hz @ ER3 [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12629|klog12629]]   * SEM update [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/]]
  * PEM MAP update [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/]]
Line 46: Line 46:
  * PEM chassis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11425|JGW-T2011425]]

 * Kozakai
  * Coupling with calibration line @ ER3 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11426|slides]]
Line 53: Line 49:
  * Master thesis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|JGW-G1910387]]

 * Fujikawa
  * Lock loss study

 * TTanaka(Niigata)
  * Magnetic field from air cooler and compressor
  * Magnetic field injection to AS and REFL table

Weekly PEM meeting

  • 2020/02/04(Tue) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Finally, we can lock the PRFPMI with OMC DC klog12763

      • ASC and noise hunting
      • Suspension control
      • Lock loss study
  • PEM plan remaining two weeks
    • PEM injection
      • Shaker and Acoustic injection
        • PSL, REFL and AS table injection again
    • Hammering test
    • Discussion about the PEM flags
    • Turning off the instruments is ongoing. we will continue to this weekend (It becomes lower priority)
    • Many microphone in the PSL room (Lower priority)
  • Conference
    • 地下宇宙若手研究会@茂住 (2020/2/22-24)

    • JPS (2020/3/16-19 @ Nagoya)
      • Yokozawa, TTanaka
    • F2F (2020/4/17-20 @ Kashiwa) wiki

    • GWADW (2020/5/11-16 @ Hokkaido)
    • KIW7 (2020/5/29-31 @ NCU, Taiwan)

Each progress

KAGRA/Subgroups/PEM/Meeting/200204/Agenda (last edited 2020-02-04 06:47:37 by TakaakiYokozawa)