Size: 2186
Comment:
|
← Revision 4 as of 2020-02-04 06:47:37 ⇥
Size: 1803
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 12: | Line 12: |
* Finally, we can lock the PRFPMI * OMC DC control, ASC |
* Finally, we can lock the PRFPMI with OMC DC [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12763|klog12763]] * ASC and noise hunting * Suspension control * Lock loss study |
Line 15: | Line 17: |
* PEM plan | * PEM plan remaining two weeks |
Line 17: | Line 19: |
* Shaker injection (TTanaka, Yokozawa) * Acoustic injection (TTanaka, Yokozawa) |
* Shaker and Acoustic injection |
Line 23: | Line 24: |
* Long term PEM evaluation * Turning off the instruments is ongoing, we will continue to this weekend * Many microphone in the PSL room(after checking the noise at higher frequency) |
* Discussion about the PEM flags * Turning off the instruments is ongoing. we will continue to this weekend (It becomes lower priority) * Many microphone in the PSL room (Lower priority) |
Line 39: | Line 40: |
* Planning toward the O3 run * IX. IY microphone * Instrument switch off |
* What should we do this week |
Line 48: | Line 47: |
* Kozakai * Coupling with calibration line @ ER3 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11426|slides]] |
|
Line 53: | Line 49: |
* Master thesis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10387|JGW-G1910387]] * Fujikawa * Lock loss study * TTanaka(Niigata) * Magnetic field from air cooler and compressor * Magnetic field injection to AS and REFL table |
Weekly PEM meeting
- 2020/02/04(Tue) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
Finally, we can lock the PRFPMI with OMC DC klog12763
- ASC and noise hunting
- Suspension control
- Lock loss study
- PEM plan remaining two weeks
- PEM injection
- Shaker and Acoustic injection
- PSL, REFL and AS table injection again
- Shaker and Acoustic injection
- Hammering test
Hammering test @ Y-end : around 2/15 (JGW-G2011419)
- Discussion about the PEM flags
- Turning off the instruments is ongoing. we will continue to this weekend (It becomes lower priority)
- Many microphone in the PSL room (Lower priority)
- PEM injection
- Conference
Each progress
- Yokozawa
- What should we do this week
- Washimi
SEM update https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/
PEM MAP update https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/
Portable PEM with DataLogger GutHub201
- TTanaka(ICRR)
- shaker injection with FPMI
- etc