Differences between revisions 1 and 2
Revision 1 as of 2020-02-28 07:29:25
Size: 2177
Comment:
Revision 2 as of 2020-02-28 07:42:46
Size: 2268
Comment:
Deletions are marked like this. Additions are marked like this.
Line 14: Line 14:
  * Lock duration is 1h -4h
   * Alignment dependence
  * 3/10 - commissioning break(?)

Weekly PEM meeting

  • 2020/02/28(Fri) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Observation run started without O3 joint observation
    • Average ~250kpc BNS detection range
    • Lock duration is 1h -4h
      • Alignment dependence
    • 3/10 - commissioning break(?)
  • PEM plan remaining two weeks
    • PEM injection
      • Shaker and Acoustic injection
        • PSL, REFL and AS table injection again
    • Hammering test
    • Discussion about the PEM flags
    • Turning off the instruments was completed
      • Check the sensitivity when we turned on the FFU
      • Microphone spectrum comparison
    • Set portable PEMs to the some point for the O3 run
      • Yend chamber?
      • Around OMC, AS table?
  • Conference
    • 地下宇宙若手研究会@茂住 (2020/2/22-24)

    • JPS (2020/3/16-19 @ Nagoya)
      • Yokozawa, TTanaka
    • F2F (2020/4/17-20 @ Kashiwa) wiki

    • Core to core application
  • Application of the author list
    • [kagra 03345] from Somiya-san e-mail
    • Deadline : 29th Feb.
    • エフォート率など相談がありましたら横澤までご連絡ください。
  • PEM meeting
    • Tuesday may be a maintenance day
    • I want to move PEM meeting to Friday and discuss what should we do during maintenance day.

Each progress

KAGRA/Subgroups/PEM/Meeting/200228/Agenda (last edited 2020-02-28 16:05:33 by tatsuki.washimi)