⇤ ← Revision 1 as of 2020-02-28 07:29:25
Size: 2177
Comment:
|
Size: 2268
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
* Lock duration is 1h -4h * Alignment dependence * 3/10 - commissioning break(?) |
Weekly PEM meeting
- 2020/02/28(Fri) 16:00-(JST)
- Regular meeting meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Observation run started without O3 joint observation
- Average ~250kpc BNS detection range
- Lock duration is 1h -4h
- Alignment dependence
- 3/10 - commissioning break(?)
- PEM plan remaining two weeks
- PEM injection
- Shaker and Acoustic injection
- PSL, REFL and AS table injection again
- Shaker and Acoustic injection
- Hammering test
Hammering test @ Y-end : around 2/15 (JGW-G2011419)
- Discussion about the PEM flags
- Turning off the instruments was completed
- Check the sensitivity when we turned on the FFU
- Microphone spectrum comparison
- Set portable PEMs to the some point for the O3 run
- Yend chamber?
- Around OMC, AS table?
- PEM injection
- Conference
- Application of the author list
- [kagra 03345] from Somiya-san e-mail
- Deadline : 29th Feb.
- エフォート率など相談がありましたら横澤までご連絡ください。
- PEM meeting
- Tuesday may be a maintenance day
- I want to move PEM meeting to Friday and discuss what should we do during maintenance day.
Each progress
- Yokozawa
- What should we do this week
- Tuned off the FFUs and vacuum pumps
- Temperature and GAS drift
- Washimi
SEM updateshttps://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/
PEM MAP update https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/
- etc