Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2020-02-28 07:29:25
Size: 2177
Comment:
Revision 6 as of 2020-02-28 10:01:32
Size: 4280
Comment:
Deletions are marked like this. Additions are marked like this.
Line 12: Line 12:
  * Observation run started without O3 joint observation   * Observation run started without O3 joining
Line 14: Line 14:
  * Lock duration is 1h -4h
   * Alignment dependence
  * Duty cycle ~65%
   * We need ~1h for initial alignment
  * 3/10 - commissioning break(?)
Line 15: Line 20:
 * PEM plan remaining two weeks  * Maintenance day (2020/03/03)
  * I asked SEO about following works
  * If you have more request, please let me or Washimi-san know first.
  * 1. (Highest priority from PEM team)
   * Go inside the mine and move the PEMs placed at OMC legs to next noise target.
   * Next target is under discussion(Candidate is IXC area).
   * Change the position of the speaker to around POP area
   * We don’t need the interferometer during this work.
   * 1 hour work.
   * Yokozawa, Washimi
  * 2. (If possible)
   * Go inside the mine.
   * Turned on the all FFUs(~5min) to evaluate the noise from FFUs.
   * If we can observe the noise from FFUs in the sensitivity curve, we can consider next target.
   * If we cannot observe the noise, current noise limit may not come from the sound inside the clean area.
   * We need the interferometer during this work.
   * 10min work
   * Yokozawa, Washimi
  * 3. (If possible)
   * Go inside the mine
   * Hammering test to the cryochambers and ducts and so on to investigate the vibration effects.
   * We need the interferometer during this work.
   * Also, the hammering test PR and IMC area is essential

 * PEM tasks during observation run
Line 17: Line 46:
  * Shaker and Acoustic injection
   * PSL, REFL and AS table injection again
   * Shaker and Acoustic injection
    * PSL, REFL and AS table injection again      * Saturday afternoon(2/29) between the lock loss and observing state
Line 20: Line 50:
     * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]]
     * Hammering test @ Y-end : around 2/15 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11419|JGW-G2011419]])
   * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]]
   * Hammering tests to the OMC, SRs, BS and PR2 were done [http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]
    * There is large excitation when we touched the legs of the OMC chamber
    * But we concluded that vibration of the logs of the OMC chamber were not the dominant noise source in the current sensitivity
     * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13152|klog13152]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13199|klog13199]]
    * Next target of investigation is the duct between PR2 and BS
     * Candidate of the 60-90Hz noise
Line 23: Line 58:
  * Turning off the instruments was completed
   * Check the sensitivity when we turned on the FFU
   * Microphone spectrum comparison
   * This may not be used during O3 run, but it is good practice toward the O4 run
   * Help the RRT(Rapid Response Team, quick discussion for the event submitted to the GraceCB)
  * Evaluate the effect of the FFUs and vacuum pumps by turning on during interferometer lock
   * If the excitation detected, we have to consider about the FFUs which are working.
Line 27: Line 63:
   * Yend chamber?
   * Around OMC, AS table?
   * Now, the legs of the OMC
   * Next target is IXC or PR2-BS or somewhere PRs or IMC area.
Line 31: Line 67:
  * [[https://sites.google.com/view/ugapw2020/home|地下宇宙若手研究会]]@茂住 (2020/2/22-24)
  * JPS (2020/3/16-19 @ Nagoya)
  * JPS (2020/3/16-19 @ Nagoya)-> Cancelled
Line 36: Line 71:
   * Miyoki-san suggested to visit Virgo to join the commissioning as the PEM team
   * If you have interested in please let me know
   * Other interesting conference? Deadline is 29th Feb.
Line 45: Line 83:
  * Earlier time is better?
Line 49: Line 88:
  * What should we do this week
  * Tuned off the FFUs and vacuum pumps
   * Temperature and GAS drift
  * Discussion about the list of the general issue
  * Current line noise identification
  * PEM coherence search to the longer locked data
  * GND issue
Line 54: Line 94:
  * Infrasound measurements [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13004|klog13004]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12859|klog12859]]
  * SEM updates[[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/]]
  * PEM MAP update [[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/PEM/PEMmap/]]
  * Investigation the environment around the OMC area
  * Investigation the water pump
  *

 * TTanaka
  * 23.3Hz noise investigation

Weekly PEM meeting

  • 2020/02/28(Fri) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Observation run started without O3 joining
    • Average ~250kpc BNS detection range
    • Lock duration is 1h -4h
      • Alignment dependence
    • Duty cycle ~65%
      • We need ~1h for initial alignment
    • 3/10 - commissioning break(?)
  • Maintenance day (2020/03/03)
    • I asked SEO about following works
    • If you have more request, please let me or Washimi-san know first.
    • 1. (Highest priority from PEM team)
      • Go inside the mine and move the PEMs placed at OMC legs to next noise target.
      • Next target is under discussion(Candidate is IXC area).
      • Change the position of the speaker to around POP area
      • We don’t need the interferometer during this work.
      • 1 hour work.
      • Yokozawa, Washimi
    • 2. (If possible)
      • Go inside the mine.
      • Turned on the all FFUs(~5min) to evaluate the noise from FFUs.
      • If we can observe the noise from FFUs in the sensitivity curve, we can consider next target.
      • If we cannot observe the noise, current noise limit may not come from the sound inside the clean area.
      • We need the interferometer during this work.
      • 10min work
      • Yokozawa, Washimi
    • 3. (If possible)
      • Go inside the mine
      • Hammering test to the cryochambers and ducts and so on to investigate the vibration effects.
      • We need the interferometer during this work.
      • Also, the hammering test PR and IMC area is essential
  • PEM tasks during observation run
    • PEM injection
      • Shaker and Acoustic injection
        • PSL, REFL and AS table injection again
        • Saturday afternoon(2/29) between the lock loss and observing state
    • Hammering test
      • 20/01/21 Minute

      • Hammering tests to the OMC, SRs, BS and PR2 were done [http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]

        • There is large excitation when we touched the legs of the OMC chamber
        • But we concluded that vibration of the logs of the OMC chamber were not the dominant noise source in the current sensitivity
        • Next target of investigation is the duct between PR2 and BS
          • Candidate of the 60-90Hz noise
    • Discussion about the PEM flags
      • This may not be used during O3 run, but it is good practice toward the O4 run
      • Help the RRT(Rapid Response Team, quick discussion for the event submitted to the GraceCB)
    • Evaluate the effect of the FFUs and vacuum pumps by turning on during interferometer lock
      • If the excitation detected, we have to consider about the FFUs which are working.
    • Set portable PEMs to the some point for the O3 run
      • Now, the legs of the OMC
      • Next target is IXC or PR2-BS or somewhere PRs or IMC area.
  • Conference
    • JPS (2020/3/16-19 @ Nagoya)-> Cancelled

      • Yokozawa, TTanaka
    • F2F (2020/4/17-20 @ Kashiwa) wiki

    • Core to core application
      • Miyoki-san suggested to visit Virgo to join the commissioning as the PEM team
      • If you have interested in please let me know
      • Other interesting conference? Deadline is 29th Feb.
  • Application of the author list
    • [kagra 03345] from Somiya-san e-mail
    • Deadline : 29th Feb.
    • エフォート率など相談がありましたら横澤までご連絡ください。
  • PEM meeting
    • Tuesday may be a maintenance day
    • I want to move PEM meeting to Friday and discuss what should we do during maintenance day.
    • Earlier time is better?

Each progress

  • Yokozawa
    • Discussion about the list of the general issue
    • Current line noise identification
    • PEM coherence search to the longer locked data
    • GND issue
  • Washimi
    • Investigation the environment around the OMC area
    • Investigation the water pump
  • TTanaka
    • 23.3Hz noise investigation
  • etc