Line 18: Line 18:
 * PEM plan remaining two weeks  * Maintenance day (2020/03/03)
  * I asked SEO about following works
  * If you have more request, please let me or Washimi-san know first.
  * 1. (Highest priority from PEM team)
   * Go inside the mine and move the PEMs placed at OMC legs to next noise target.
   * Next target is under discussion(Candidate is IXC area).
   * Change the position of the speaker to around POP area
   * We don’t need the interferometer during this work.
   * 1 hour work.
   * Yokozawa, Washimi
  * 2. (If possible)
   * Go inside the mine.
   * Turned on the all FFUs(~5min) to evaluate the noise from FFUs.
   * If we can observe the noise from FFUs in the sensitivity curve, we can consider next target.
   * If we cannot observe the noise, current noise limit may not come from the sound inside the clean area.
   * We need the interferometer during this work.
   * 10min work
   * Yokozawa, Washimi
  * 3. (If possible)
   * Go inside the mine
   * Hammering test to the cryochambers and ducts and so on to investigate the vibration effects.
   * We need the interferometer during this work.
   * Also, the hammering test PR and IMC area is essential

 * PEM tasks during observation run
Line 20: Line 44:
  * Shaker and Acoustic injection
   * PSL, REFL and AS table injection again
   * Shaker and Acoustic injection
    * PSL, REFL and AS table injection again      * Saturday afternoon(2/29) between the lock loss and observing state
Line 23: Line 48:
     * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]]
   * Hammering test @ Y-end : around 2/15 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11419|JGW-G2011419]])
   *
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]]
   * Hammering test @ Y-end : around 2/15 ([[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11419|JGW-G2011419]])

Weekly PEM meeting

  • 2020/02/28(Fri) 16:00-(JST)
  • Regular meeting meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Observation run started without O3 joint observation
    • Average ~250kpc BNS detection range
    • Lock duration is 1h -4h
      • Alignment dependence
    • 3/10 - commissioning break(?)
  • Maintenance day (2020/03/03)
    • I asked SEO about following works
    • If you have more request, please let me or Washimi-san know first.
    • 1. (Highest priority from PEM team)
      • Go inside the mine and move the PEMs placed at OMC legs to next noise target.
      • Next target is under discussion(Candidate is IXC area).
      • Change the position of the speaker to around POP area
      • We don’t need the interferometer during this work.
      • 1 hour work.
      • Yokozawa, Washimi
    • 2. (If possible)
      • Go inside the mine.
      • Turned on the all FFUs(~5min) to evaluate the noise from FFUs.
      • If we can observe the noise from FFUs in the sensitivity curve, we can consider next target.
      • If we cannot observe the noise, current noise limit may not come from the sound inside the clean area.
      • We need the interferometer during this work.
      • 10min work
      • Yokozawa, Washimi
    • 3. (If possible)
      • Go inside the mine
      • Hammering test to the cryochambers and ducts and so on to investigate the vibration effects.
      • We need the interferometer during this work.
      • Also, the hammering test PR and IMC area is essential
  • PEM tasks during observation run
    • PEM injection
      • Shaker and Acoustic injection
        • PSL, REFL and AS table injection again
        • Saturday afternoon(2/29) between the lock loss and observing state
    • Hammering test
    • Discussion about the PEM flags
    • Turning off the instruments was completed
      • Check the sensitivity when we turned on the FFU
      • Microphone spectrum comparison
    • Set portable PEMs to the some point for the O3 run
      • Yend chamber?
      • Around OMC, AS table?
  • Conference
    • 地下宇宙若手研究会@茂住 (2020/2/22-24)

    • JPS (2020/3/16-19 @ Nagoya)
      • Yokozawa, TTanaka
    • F2F (2020/4/17-20 @ Kashiwa) wiki

    • Core to core application
  • Application of the author list
    • [kagra 03345] from Somiya-san e-mail
    • Deadline : 29th Feb.
    • エフォート率など相談がありましたら横澤までご連絡ください。
  • PEM meeting
    • Tuesday may be a maintenance day
    • I want to move PEM meeting to Friday and discuss what should we do during maintenance day.

Each progress