== Weekly PEM meeting == * 2020/02/28(Fri) 16:00-(JST) * Regular meeting meeting (Japanese) * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) === Agenda ===   ==== General issue ==== * Interferometer status * Observation run started without O3 joining * Average ~250kpc BNS detection range * Lock duration is 1h -4h * Alignment dependence * Duty cycle ~65% * We need ~1h for initial alignment * 3/10 - commissioning break(?) * Maintenance day (2020/03/03) * I asked SEO about following works * If you have more request, please let Yokozawa or Washimi-san know first. * 1. (Highest priority from PEM team) * Go inside the mine and move the PEMs placed at OMC legs to next noise target. * Next target is under discussion(Candidate is IXC area). * Change the position of the speaker to around POP area * We don’t need the interferometer during this work. * 1 hour work. * Yokozawa, Washimi * 2. (If possible) * Go inside the mine. * Turned on the all FFUs(~5min) to evaluate the noise from FFUs. * If we can observe the noise from FFUs in the sensitivity curve, we can consider next target. * If we cannot observe the noise, current noise limit may not come from the sound inside the clean area. * We need the interferometer during this work. * 10min work * Yokozawa, Washimi * 3. (If possible) * Go inside the mine * Hammering test to the cryochambers and ducts and so on to investigate the vibration effects. * We need the interferometer during this work. * Also, the hammering test PR and IMC area is essential * PEM tasks during observation run * PEM injection * Shaker and Acoustic injection * PSL, REFL and AS table injection again * Saturday afternoon(2/29) between the lock loss and observing state * Hammering test * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]] * Hammering tests to the OMC, SRs, BS and PR2 were done [http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138] * There is large excitation when we touched the legs of the OMC chamber * But we concluded that vibration of the logs of the OMC chamber were not the dominant noise source in the current sensitivity * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13152|klog13152]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13199|klog13199]] * Next target of investigation is the duct between PR2 and BS * Candidate of the 60-90Hz noise * Discussion about the PEM flags * This may not be used during O3 run, but it is good practice toward the O4 run * Help the RRT(Rapid Response Team, quick discussion for the event submitted to the GraceCB) * Evaluate the effect of the FFUs and vacuum pumps by turning on during interferometer lock * If the excitation detected, we have to consider about the FFUs which are working. * Set portable PEMs to the some point for the O3 run * Now, the legs of the OMC * Next target is IXC or PR2-BS or somewhere PRs or IMC area. * Conference * JPS (2020/3/16-19 @ Nagoya)-> Cancelled * Yokozawa, TTanaka * F2F (2020/4/17-20 @ Kashiwa) [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2020Apr|wiki]] * Core to core application * Miyoki-san suggested to visit Virgo to join the commissioning as the PEM team * If you have interested in please let me know * Other interesting conference? Deadline is 29th Feb. * Application of the author list * [kagra 03345] from Somiya-san e-mail * Deadline : 29th Feb. * エフォート率など相談がありましたら横澤までご連絡ください。 * PEM meeting * Tuesday may be a maintenance day * I want to move PEM meeting to Friday and discuss what should we do during maintenance day. * Earlier time is better? ==== Each progress ==== * Yokozawa * Discussion about the list of the general issue * Current line noise identification * PEM coherence search to the longer locked data * GND issue * Washimi * Investigation the environment around the OMC area [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13181|klog13181]] -> [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13197|klog13197]] * Investigation the water pump [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13199|klog13199]] * * TTanaka * 23.3Hz noise investigation * Yuzurihara * Updated Pastavi * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=12872 | Pastai update : Add button for h(t) channel, Taking overlap in PSD estimation]] * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13194 | Pastai update : Added mass-range estimation]]