Differences between revisions 1 and 2
Revision 1 as of 2020-03-11 20:40:35
Size: 3015
Comment:
Revision 2 as of 2020-03-12 15:50:14
Size: 2431
Comment:
Deletions are marked like this. Additions are marked like this.
Line 24: Line 24:
 * PEM tasks March  * PEM tasks in March
Line 27: Line 27:
    * Acoustic injection to PSL room was done
    * Acoustic injection to REFL table was done.
     * We set additional accelerometers to the leg of the MCF chamber ground, IMMT1/ISS and PRM chamber leg [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13293|klog13293]]
     * Analysis is ongoing by Washimi-san ant TTanaka-san
    * Done : PSL room, PR booth, BS booth, (SR booth)
    * ToDo : IXC booth, IYC booth, EYC booth, TMSY booth
   * Shaker injection
    * ToDo : OMC leg, ISS, IMC table, REFL tabel, ...
Line 35: Line 35:
    * But we concluded that vibration of the logs of the OMC chamber were not the dominant noise source in the current sensitivity       * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13152|klog13152]] and [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13199|klog13199]]     * --(But we concluded that vibration of the logs of the OMC chamber were not the dominant noise source in the current sensitivity)--
Line 47: Line 46:
  * F2F (2020/4/17-20 @ Kashiwa) [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2020Apr|wiki]]   * F2F (2020/4/17-20 @ Kashiwa) [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2020Apr|wiki]] ->canceled
Line 54: Line 53:
 * GND meeting report (Yokozawa)

 * Acoustic injection result (Washimi, TTanaka)
  * Sound in DARM [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13373]]
  * Sound in other channels : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13298]]
  * Consideration of current PEM injection analysis : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13263]]
 * Seismometer tilt coupling (Washimi, Miyo)
  * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13321]]
 * 23.3Hz noise investigation (TTanaka)
 * PEM injection result (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11550|JGW-G2011550]]

Weekly PEM meeting

  • 2020/03/06(Fri) 14:00-(JST)
  • Regular meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Observation run started without O3 joining
    • Maximum 500kpc BNS detection range
    • Lock duration is 1h -4h
      • Alignment dependence
    • Duty cycle ~65%
      • We need ~1h for initial alignment
    • If microseismic motion is large, we could not lock the interferometer
    • 3/10 - commissioning break
  • Commissioning break (2020/03/10 9 am -03/24 9 am)
    • After the commissioning meeting, I and Washimi-san make the schedule.
  • PEM tasks in March
    • PEM injection
      • Acoustic injection
        • Done : PSL room, PR booth, BS booth, (SR booth)
        • ToDo : IXC booth, IYC booth, EYC booth, TMSY booth

      • Shaker injection
        • ToDo : OMC leg, ISS, IMC table, REFL tabel, ...

    • Hammering test
      • 20/01/21 Minute

      • Hammering tests to the OMC, SRs, BS and PR2 were done [http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138]

        • There is large excitation when we touched the legs of the OMC chamber
        • But we concluded that vibration of the logs of the OMC chamber were not the dominant noise source in the current sensitivity

        • Next target of investigation is the duct between PR2 and BS
          • Candidate of the 60-90Hz noise
    • Discussion about the PEM flags
      • This may not be used during O3 run, but it is good practice toward the O4 run
      • Help the RRT(Rapid Response Team, quick discussion for the event submitted to the GraceCB)
      • Seismic motion flag
    • Evaluate the effect of the FFUs and vacuum pumps by turning on during interferometer lock
      • If the excitation detected, we have to consider about the FFUs which are working.
  • Conference
    • F2F (2020/4/17-20 @ Kashiwa) wiki ->canceled

Each progress

  • Discussion about the list of the general issue (Yokozawa)
  • Bruco analysis (Yokozawa)
  • PEM coherence search to the longer locked data (Yokozawa)
  • PEM injection result (Washimi) JGW-G2011550

  • Plan of the lock loss study (Fujikawa)

KAGRA/Subgroups/PEM/Meeting/200313/Agenda (last edited 2020-03-13 03:22:02 by TakaakiYokozawa)