Size: 2431
Comment:
|
← Revision 3 as of 2020-03-13 03:22:02 ⇥
Size: 937
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2020/03/06(Fri) 14:00-(JST) | * 2020/03/13(Fri) 16:00-(JST) |
Line 5: | Line 5: |
Line 12: | Line 11: |
* Observation run started without O3 joining * Maximum 500kpc BNS detection range * Lock duration is 1h -4h * Alignment dependence * Duty cycle ~65% * We need ~1h for initial alignment * If microseismic motion is large, we could not lock the interferometer * 3/10 - commissioning break * Commissioning break (2020/03/10 9 am -03/24 9 am) * After the commissioning meeting, I and Washimi-san make the schedule. |
* Two weeks observation was finished * Maximum 594kpc BNS detection range * Maximum Lock duration is over 10h * 3/10 - commissioning break started * Noise projection * Hammering test (Sat. and Sun. morning time) |
Line 25: | Line 19: |
* PEM injection * Acoustic injection * Done : PSL room, PR booth, BS booth, (SR booth) * ToDo : IXC booth, IYC booth, EYC booth, TMSY booth * Shaker injection * ToDo : OMC leg, ISS, IMC table, REFL tabel, ... * Hammering test * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Meeting/200121/Minute|20/01/21 Minute]] * Hammering tests to the OMC, SRs, BS and PR2 were done [http://klog.icrr.u-tokyo.ac.jp/osl/?r=13138|klog13138] * There is large excitation when we touched the legs of the OMC chamber * --(But we concluded that vibration of the logs of the OMC chamber were not the dominant noise source in the current sensitivity)-- * Next target of investigation is the duct between PR2 and BS * Candidate of the 60-90Hz noise * Discussion about the PEM flags * This may not be used during O3 run, but it is good practice toward the O4 run * Help the RRT(Rapid Response Team, quick discussion for the event submitted to the GraceCB) * Seismic motion flag * Evaluate the effect of the FFUs and vacuum pumps by turning on during interferometer lock * If the excitation detected, we have to consider about the FFUs which are working. |
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/MAR2020|task list]] |
Line 45: | Line 21: |
* Conference * F2F (2020/4/17-20 @ Kashiwa) [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2020Apr|wiki]] ->canceled |
|
Line 49: | Line 22: |
Weekly PEM meeting
- 2020/03/13(Fri) 16:00-(JST)
- Regular meeting (Japanese)
Web meeting with Zoom2 (Zoom2)
Agenda
General issue
- Interferometer status
- Two weeks observation was finished
- Maximum 594kpc BNS detection range
- Maximum Lock duration is over 10h
- 3/10 - commissioning break started
- Noise projection
- Hammering test (Sat. and Sun. morning time)
- Two weeks observation was finished
- PEM tasks in March
Each progress
- Discussion about the list of the general issue (Yokozawa)
- Bruco analysis (Yokozawa)
- PEM coherence search to the longer locked data (Yokozawa)
PEM injection result (Washimi) JGW-G2011550
- Plan of the lock loss study (Fujikawa)