Differences between revisions 1 and 2
Revision 1 as of 2020-03-17 01:27:52
Size: 990
Comment:
Revision 2 as of 2020-03-17 01:33:25
Size: 1306
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
  * Noise budget was (almost) completed
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13600|klog13600]]
   * Below 70 Hz : Type-A control noise
   * 70 - 100Hz : Unknown
   * 100 - 200 : Actuator DAC noise(?)
   * 200 - 400 : Acoustic noise around IMM area (?)
   * Above 400 Hz : Shot noise and CARM noise

Weekly PEM meeting

  • 2020/03/20(Fri) 14:00-(JST)
  • Regular meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Sorry for the meeting at the national holiday.
  • Interferometer status
    • Two weeks observation was finished
      • Maximum 594kpc BNS detection range
      • Maximum Lock duration is over 10h
    • 3/10 - commissioning break started
      • Noise projection
      • Hammering test (Sat. and Sun. morning time)
    • Noise budget was (almost) completed
      • klog13600

      • Below 70 Hz : Type-A control noise
      • 70 - 100Hz : Unknown
      • 100 - 200 : Actuator DAC noise(?)
      • 200 - 400 : Acoustic noise around IMM area (?)
      • Above 400 Hz : Shot noise and CARM noise
  • PEM tasks in March

Each progress

  • Discussion about the list of the general issue (Yokozawa)
  • Bruco analysis (Yokozawa)
  • PEM coherence search to the longer locked data (Yokozawa)
  • PEM injection result (Washimi) JGW-G2011550

  • Plan of the lock loss study (Fujikawa)

KAGRA/Subgroups/PEM/Meeting/200320/Agenda (last edited 2020-03-20 13:30:21 by tatsuki.washimi)