== Weekly PEM meeting == * 2020/03/20(Fri) 14:00-(JST) * Regular meeting (Japanese) * Web meeting with Zoom2 ([[https://zoom.us/j/6676627462|Zoom2]]) === Agenda ===   ==== General issue ==== * Sorry for the meeting at the national holiday. * Interferometer status * Two weeks observation was finished * Maximum 594kpc BNS detection range * Maximum Lock duration is over 10h * 3/10 - commissioning break started * Noise projection * Hammering test (Sat. and Sun. morning time) * Noise budget was (almost) completed * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13600|klog13600]] * Below 70 Hz : Type-A control noise * 70 - 100Hz : Unknown * 100 - 200 : Actuator DAC noise(?) * 200 - 400 : Acoustic noise around IMM area (?) * Above 400 Hz : Shot noise, Laser noise(Intensity, frequency) * PEM tasks in March * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/MAR2020|task list]] * PRM booth MICを常設にしませんか? (IOO1 BNC ch11かch12で) ==== Each progress ==== * Discussion about the list of the general issue (Yokozawa) * Acoustic injection and hammering test result (Washimi) * Data and Results list : [[KAGRA/Subgroups/PEM/PEMinjection/O3]] * KAGRA Noise INJection Analizer; NINJA : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11564|JGW-T2011564]] * Plan of the lock loss study (Fujikawa)