Line 10: Line 10:
 * Sorry for the meeting at the national holiday.  * Interferometer status
  * Two weeks observation was performed
   * Very limited onsite people operated the interferometer
   * End 4/20 9:00 a.m(JST)
   * After that, calibration group may work
Line 12: Line 16:
 * Interferometer status
  * Two weeks observation was finished
   * Maximum 594kpc BNS detection range
   * Maximum Lock duration is over 10h
  * 3/10 - commissioning break started
   * Noise projection
   * Hammering test (Sat. and Sun. morning time)
 * Tasks for post-commissioning
  * [[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|post commissioning]]
   * Scattered light (One of the hammering test)
   * OMC chamber vibration RMS
   * PEM injection
   * Line noise investigation by PEM
Line 20: Line 23:
  * Noise budget was (almost) completed
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13600|klog13600]]
   * Below 70 Hz : Type-A control noise
   * 70 - 100Hz : Unknown
   * 100 - 200 : Actuator DAC noise(?)
   * 200 - 400 : Acoustic noise around IMM area (?)
   * Above 400 Hz : Shot noise, Laser noise(Intensity, frequency)
 * PEM papers
  * Portable PEMs
  * KAGRA summary paper (Preparation of PEMs is main target)
  * O3 PEM paper
   * Acoustic injection
   * Noise budget (?)
Line 28: Line 30:
 * PEM tasks in March
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/MAR2020|task list]]
  * PRM booth MICを常設にしませんか? (IOO1 BNC ch11かch12で)
 * Task management 2020
  * Join the PEM meeting
  * Analysis related PEM (Need the communication with Yokozawa or Washimi)
  * PEM installation towar O4
  * Preparation for PEM injection
  * If you will have efforts for PEM, please contact to Yokozawa or Washimi
  * Preparation, development, update of new monitors will be added as PEM effort
   * Example : update glitch plot, daily summary page.
   * But "just use them" may not include as PEM effort -> Shift or commissioning
Line 33: Line 42:
 * Discussion about the list of the general issue (Yokozawa)
 * Acoustic injection and hammering test result (Washimi)
   * Data and Results list : [[KAGRA/Subgroups/PEM/PEMinjection/O3]]
   * KAGRA Noise INJection Analizer; NINJA : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11564|JGW-T2011564]]

 * Plan of the lock loss study (Fujikawa)
 *

Weekly PEM meeting

  • 2020/04/17(Fri) 16:00-(JST)
  • Regular meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Two weeks observation was performed
      • Very limited onsite people operated the interferometer
      • End 4/20 9:00 a.m(JST)
      • After that, calibration group may work
  • Tasks for post-commissioning
    • post commissioning

      • Scattered light (One of the hammering test)
      • OMC chamber vibration RMS
      • PEM injection
      • Line noise investigation by PEM
  • PEM papers
    • Portable PEMs
    • KAGRA summary paper (Preparation of PEMs is main target)
    • O3 PEM paper
      • Acoustic injection
      • Noise budget (?)
  • Task management 2020
    • Join the PEM meeting
    • Analysis related PEM (Need the communication with Yokozawa or Washimi)
    • PEM installation towar O4
    • Preparation for PEM injection
    • If you will have efforts for PEM, please contact to Yokozawa or Washimi
    • Preparation, development, update of new monitors will be added as PEM effort
      • Example : update glitch plot, daily summary page.
      • But "just use them" may not include as PEM effort -> Shift or commissioning

Each progress