Differences between revisions 1 and 9 (spanning 8 versions)
Revision 1 as of 2020-04-17 06:38:51
Size: 1450
Comment:
Revision 9 as of 2020-04-17 12:12:45
Size: 2023
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2020/04/17(Fri) 16:00-(JST)  * 2020/04/17(Fri) 14:00-(JST)
Line 10: Line 10:
 * Sorry for the meeting at the national holiday.  * Interferometer status
  * Two weeks observation was performed
   * Very limited onsite people operated the interferometer
   * End 4/20 9:00 a.m(JST)
   * After that, calibration group may work
Line 12: Line 16:
 * Interferometer status
  * Two weeks observation was finished
   * Maximum 594kpc BNS detection range
   * Maximum Lock duration is over 10h
  * 3/10 - commissioning break started
   * Noise projection
   * Hammering test (Sat. and Sun. morning time)
 * Tasks for post-commissioning
  * [[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|post commissioning]]
   * Scattered light (One of the hammering test)
   * OMC chamber vibration RMS
   * PEM injection
   * Line noise investigation by PEM
Line 20: Line 23:
  * Noise budget was (almost) completed
   * [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13600|klog13600]]
   * Below 70 Hz : Type-A control noise
   * 70 - 100Hz : Unknown
   * 100 - 200 : Actuator DAC noise(?)
   * 200 - 400 : Acoustic noise around IMM area (?)
   * Above 400 Hz : Shot noise, Laser noise(Intensity, frequency)
 * PEM papers
  * Portable PEMs
  * KAGRA summary paper (Preparation of PEMs is main target)
  * O3 PEM paper
   * Acoustic injection
   * Noise budget (?)
Line 28: Line 30:
 * PEM tasks in March
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/MAR2020|task list]]
  * PRM booth MICを常設にしませんか? (IOO1 BNC ch11かch12で)
 * Task management 2020
  * Join the PEM meeting
  * Analysis related PEM (Need the communication with Yokozawa or Washimi)
  * PEM installation toward O4
   * cabling ([[https://github.com/gw-pem/kagra-pem/issues/204|github204]]), ondotori ([[https://github.com/gw-pem/kagra-pem/issues/205|github205]]), water fluod ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]])
  * Preparation for PEM injection
  * If you will have efforts for PEM, please contact to Yokozawa or Washimi
  * Preparation, development, update of new monitors will be added as PEM effort
   * Example : update glitch plot, daily summary page.
   * But "just use them" may not include as PEM effort -> Shift or commissioning
Line 33: Line 43:
 * Discussion about the list of the general issue (Yokozawa)
 * Acoustic injection and hammering test result (Washimi)
   * Data and Results list : [[KAGRA/Subgroups/PEM/PEMinjection/O3]]
   * KAGRA Noise INJection Analizer; NINJA : [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11564|JGW-T2011564]]
Line 38: Line 44:
 * Plan of the lock loss study (Fujikawa)  * Discuss about the general issue (Yokozawa)
 * GND noise preparation after O3 post commissioning (Yokozawa)
 * Line noise subtruction (Washimi) : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14138|60Hz power]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14126|180Hz violin mode]]
 * Glitch plot report (Kozakai)
 * Yuzu summary page report (Yuzurihara)
 * Update of the pastavi (Yuzurihara)
  

Weekly PEM meeting

  • 2020/04/17(Fri) 14:00-(JST)
  • Regular meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Two weeks observation was performed
      • Very limited onsite people operated the interferometer
      • End 4/20 9:00 a.m(JST)
      • After that, calibration group may work
  • Tasks for post-commissioning
    • post commissioning

      • Scattered light (One of the hammering test)
      • OMC chamber vibration RMS
      • PEM injection
      • Line noise investigation by PEM
  • PEM papers
    • Portable PEMs
    • KAGRA summary paper (Preparation of PEMs is main target)
    • O3 PEM paper
      • Acoustic injection
      • Noise budget (?)
  • Task management 2020
    • Join the PEM meeting
    • Analysis related PEM (Need the communication with Yokozawa or Washimi)
    • PEM installation toward O4
    • Preparation for PEM injection
    • If you will have efforts for PEM, please contact to Yokozawa or Washimi
    • Preparation, development, update of new monitors will be added as PEM effort
      • Example : update glitch plot, daily summary page.
      • But "just use them" may not include as PEM effort -> Shift or commissioning

Each progress

  • Discuss about the general issue (Yokozawa)
  • GND noise preparation after O3 post commissioning (Yokozawa)
  • Line noise subtruction (Washimi) : 60Hz power, 180Hz violin mode

  • Glitch plot report (Kozakai)
  • Yuzu summary page report (Yuzurihara)
  • Update of the pastavi (Yuzurihara)

KAGRA/Subgroups/PEM/Meeting/200417/Agenda (last edited 2020-04-17 14:48:01 by tatsuki.washimi)