Differences between revisions 2 and 8 (spanning 6 versions)
Revision 2 as of 2020-04-17 06:44:22
Size: 483
Comment:
Revision 8 as of 2020-04-17 07:24:30
Size: 1645
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2020/04/17(Fri) 16:00-(JST)  * 2020/04/17(Fri) 14:00-(JST)
Line 17: Line 17:
  *   * [[https://docs.google.com/spreadsheets/d/1w4q8OvX9E6nkYSgshLYLoZH5yvQXHvGmL1agux8ztx0/edit?usp=sharing|post commissioning]]
   * Scattered light (One of the hammering test)
   * OMC chamber vibration RMS
   * PEM injection
   * Line noise investigation by PEM

 * PEM papers
  * Portable PEMs
  * KAGRA summary paper (Preparation of PEMs is main target)
  * O3 PEM paper
   * Acoustic injection
   * Noise budget (?)

 * Task management 2020
  * Join the PEM meeting
  * Analysis related PEM (Need the communication with Yokozawa or Washimi)
  * PEM installation towar O4
  * Preparation for PEM injection
  * If you will have efforts for PEM, please contact to Yokozawa or Washimi
  * Preparation, development, update of new monitors will be added as PEM effort
   * Example : update glitch plot, daily summary page.
   * But "just use them" may not include as PEM effort -> Shift or commissioning
Line 20: Line 42:
 *
 * Discuss about the general issue (Yokozawa)
 * GND noise preparation after O3 post commissioning (Yokozawa)
 * (Washimi)
 * Glitch plot report (Kozakai)
 * Yuzu summary page report (Yuzurihara)
 * Update of the pastavi (Yuzurihara)
  

Weekly PEM meeting

  • 2020/04/17(Fri) 14:00-(JST)
  • Regular meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Two weeks observation was performed
      • Very limited onsite people operated the interferometer
      • End 4/20 9:00 a.m(JST)
      • After that, calibration group may work
  • Tasks for post-commissioning
    • post commissioning

      • Scattered light (One of the hammering test)
      • OMC chamber vibration RMS
      • PEM injection
      • Line noise investigation by PEM
  • PEM papers
    • Portable PEMs
    • KAGRA summary paper (Preparation of PEMs is main target)
    • O3 PEM paper
      • Acoustic injection
      • Noise budget (?)
  • Task management 2020
    • Join the PEM meeting
    • Analysis related PEM (Need the communication with Yokozawa or Washimi)
    • PEM installation towar O4
    • Preparation for PEM injection
    • If you will have efforts for PEM, please contact to Yokozawa or Washimi
    • Preparation, development, update of new monitors will be added as PEM effort
      • Example : update glitch plot, daily summary page.
      • But "just use them" may not include as PEM effort -> Shift or commissioning

Each progress

  • Discuss about the general issue (Yokozawa)
  • GND noise preparation after O3 post commissioning (Yokozawa)
  • (Washimi)
  • Glitch plot report (Kozakai)
  • Yuzu summary page report (Yuzurihara)
  • Update of the pastavi (Yuzurihara)

KAGRA/Subgroups/PEM/Meeting/200417/Agenda (last edited 2020-04-17 14:48:01 by tatsuki.washimi)