Differences between revisions 7 and 9 (spanning 2 versions)
Revision 7 as of 2020-04-17 07:11:08
Size: 1645
Comment:
Revision 9 as of 2020-04-17 12:12:45
Size: 2023
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2020/04/17(Fri) 16:00-(JST)  * 2020/04/17(Fri) 14:00-(JST)
Line 33: Line 33:
  * PEM installation towar O4   * PEM installation toward O4
   * cabling ([[https://github.com/gw-pem/kagra-pem/issues/204|github204]]), ondotori ([[https://github.com/gw-pem/kagra-pem/issues/205|github205]]), water fluod ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]])
Line 45: Line 46:
 * (Washimi)  * Line noise subtruction (Washimi) : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14138|60Hz power]], [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14126|180Hz violin mode]]

Weekly PEM meeting

  • 2020/04/17(Fri) 14:00-(JST)
  • Regular meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Two weeks observation was performed
      • Very limited onsite people operated the interferometer
      • End 4/20 9:00 a.m(JST)
      • After that, calibration group may work
  • Tasks for post-commissioning
    • post commissioning

      • Scattered light (One of the hammering test)
      • OMC chamber vibration RMS
      • PEM injection
      • Line noise investigation by PEM
  • PEM papers
    • Portable PEMs
    • KAGRA summary paper (Preparation of PEMs is main target)
    • O3 PEM paper
      • Acoustic injection
      • Noise budget (?)
  • Task management 2020
    • Join the PEM meeting
    • Analysis related PEM (Need the communication with Yokozawa or Washimi)
    • PEM installation toward O4
    • Preparation for PEM injection
    • If you will have efforts for PEM, please contact to Yokozawa or Washimi
    • Preparation, development, update of new monitors will be added as PEM effort
      • Example : update glitch plot, daily summary page.
      • But "just use them" may not include as PEM effort -> Shift or commissioning

Each progress

  • Discuss about the general issue (Yokozawa)
  • GND noise preparation after O3 post commissioning (Yokozawa)
  • Line noise subtruction (Washimi) : 60Hz power, 180Hz violin mode

  • Glitch plot report (Kozakai)
  • Yuzu summary page report (Yuzurihara)
  • Update of the pastavi (Yuzurihara)

KAGRA/Subgroups/PEM/Meeting/200417/Agenda (last edited 2020-04-17 14:48:01 by tatsuki.washimi)