Differences between revisions 9 and 11 (spanning 2 versions)
Revision 9 as of 2020-04-17 12:12:45
Size: 2023
Comment:
Revision 11 as of 2020-04-17 14:48:01
Size: 2229
Comment:
Deletions are marked like this. Additions are marked like this.
Line 34: Line 34:
   * cabling ([[https://github.com/gw-pem/kagra-pem/issues/204|github204]]), ondotori ([[https://github.com/gw-pem/kagra-pem/issues/205|github205]]), water fluod ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]])    * cabling ([[https://github.com/gw-pem/kagra-pem/issues/204|github204]]), ondotori ([[https://github.com/gw-pem/kagra-pem/issues/205|github205]]), water fluid ([[https://github.com/gw-pem/kagra-pem/issues/207|github207]])
   * read out of the lightning sensot ([[https://github.com/gw-pem/kagra-pem/issues/182|github182]]) : Shingakujutsu-kobo is acccepted
Line 47: Line 48:
 * Earthquake flag : [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=13813]]

Weekly PEM meeting

  • 2020/04/17(Fri) 14:00-(JST)
  • Regular meeting (Japanese)
  • Web meeting with Zoom2 (Zoom2)

Agenda

General issue

  • Interferometer status
    • Two weeks observation was performed
      • Very limited onsite people operated the interferometer
      • End 4/20 9:00 a.m(JST)
      • After that, calibration group may work
  • Tasks for post-commissioning
    • post commissioning

      • Scattered light (One of the hammering test)
      • OMC chamber vibration RMS
      • PEM injection
      • Line noise investigation by PEM
  • PEM papers
    • Portable PEMs
    • KAGRA summary paper (Preparation of PEMs is main target)
    • O3 PEM paper
      • Acoustic injection
      • Noise budget (?)
  • Task management 2020
    • Join the PEM meeting
    • Analysis related PEM (Need the communication with Yokozawa or Washimi)
    • PEM installation toward O4
    • Preparation for PEM injection
    • If you will have efforts for PEM, please contact to Yokozawa or Washimi
    • Preparation, development, update of new monitors will be added as PEM effort
      • Example : update glitch plot, daily summary page.
      • But "just use them" may not include as PEM effort -> Shift or commissioning

Each progress

KAGRA/Subgroups/PEM/Meeting/200417/Agenda (last edited 2020-04-17 14:48:01 by tatsuki.washimi)