Size: 6075
Comment:
|
← Revision 8 as of 2020-06-26 15:43:27 ⇥
Size: 5786
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 13: | Line 13: |
* KIW7 * The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18) * Yokozawa is supprted by C2C program |
|
Line 17: | Line 20: |
* Now interferometer is "suspend mode" but post-observation * 6/1-6/5 Suspension noise budget, PEM injection * 6/8-6/12 Interferometer parameter measurements |
* Now interferometer is post-observation * It may continue to end of June * Request 1 day for PEM injection * IMC scattered light check by GigE camera (6/30 Kokeyama, Yokozawa) * Check the OMC leg vibration * 6/25 early morning PRFPMI lock with better alignment -> If you interested in, you can use data |
Line 22: | Line 28: |
* But there are many earthquakes in Japan. | * Earthquake in Japan is frequent, suspension master guardian worked well * Schedule for O4 will be discuss later |
Line 25: | Line 32: |
* Vibration measurement for OpLevs (+Ushiba, 6/1,4)-> Done * But, we need to check the accelerometer noise level. |
|
Line 29: | Line 34: |
* 6/11 : Day 2 : re-measurement of Day 1 * Unclear : Day 3 : For each booth (mine work) -> noise budget |
* 6/11 : Day 2 : re-measurement of Day 1 (REFL) + PSL * Unclear : Day 3 : BS, SR, ITMX '''<<Before DRFPMI study (Jul.)>>''' |
Line 34: | Line 39: |
* IMC scattered light by GigE camera (Explained avobe) | |
Line 38: | Line 44: |
* We can do data analysis in your home. Let's check PEM data! | * --( From July, (If U-tokyo level became 0.5) we can work as usual(maybe), if you have a plan to visit KAGRA site, please contact to Yokozawa first )-- * Situation is unclear, I will explain in this meeting. |
Line 42: | Line 49: |
* We want to start using the slack by communication. I will send the message to candidate | |
Line 47: | Line 55: |
* KAGRA summary paper(Yokozawa) '''<<Submitted to CPC>>''' * Part of the KAGRA overview paper * PTEP (Overview of KAGRA : (3) Detector characterization, calibration, physical environment, and data quality)[[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11664|klog11664]] * Installation * Technical issue * Acoustic injection paper (Washimi) '''<<ON GOING>>''' * Target journal : Classical and Quantum Gravity * Request 3+8 hours data taking to commissioning * Portable PEMs (Yokozawa+) ''''<<Start investigation>>''' |
[[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/PEM/Reports/JurnalPaperIssue|Details are here!]] * PTEP (2) : noise budget(K.Yamamoto) * Start investigation (?) * PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) '''<<Submitted to CPC>>''' * Acoustic injection paper (Washimi) '''<<Analysis ON GOING>>''' * ICA for E-run/O3GK (Kume, Yokoyama) '''<<Analysis ON GOING>>''' * Portable PEMs (Yokozawa+) '''<<Start investigation>>''' |
Line 65: | Line 68: |
4.1 USB type PEMs 4.2 Combination with Chromebook and USB tpye PEMs 4.3 Recording system and offline analysis |
4.1 USB type PEMs <<BR>> 4.2 Combination with Chromebook and USB tpye PEMs <<BR>> 4.3 Recording system and offline analysis <<BR>> |
Line 70: | Line 73: |
5.1 44Hz vibration noise 5.2 Sound and vibration from air conditioner and FFU 5.3 Oshino-san, Shimode-san magnetic field with circuit |
5.1 44Hz vibration noise <<BR>> 5.2 Sound and vibration from air conditioner and FFU <<BR>> 5.3 Oshino-san, Shimode-san magnetic field with circuit <<BR>> |
Line 75: | Line 78: |
* Ground motion paper (Yokozawa+) * Technical note * Just for memo(忘備録) * If we can summary for special issue, we will start the discussion for journal paper * Lock loss study by earthquake * Micro-seismic motion * Seasonal ground motion * Newtonian noise * Baseline compensation * Human activity and its effect * etc. * PEM summary note (Yokozawa+) * Just for memo, technical note * What we did toward the observation * If we can summary for special issue, we will start the discussion for journal paper * PEM map * Lock loss study * Scattered light * etc. * Acoustic reverberation paper (Washimi+Virgo) * KAGRA data & Virgo data * need more analysis (March data in Virgo) * Magnetic field paper (Washimi+) * Target journal->to be discussed later * section 1. Introduction 2. 1-year Geomagnetism in underground 3. 1-year Schumann resonance in underground 4. Mag. field in EXC chamber 5. Coherence between PRFPMI and MAGs 6. Lightning effect on PRFPMI (3/22 event) 7. Conclusion * Other topic |
* Acoustic reverberation paper (Washimi+Virgo) '''<<PLAN>>''' * Magnetic field paper (Washimi+) '''<<PLAN>>''' * Ground motion paper (Yokozawa+) '''<<PLAN>>''' * PEM summary note (Yokozawa+) '''<<PLAN>>''' * Other topics |
Line 123: | Line 93: |
* ICA analysis for E-run/O3GK (Kume, Yokoyama) | |
Line 128: | Line 98: |
* Now, the priority of O3c is lower. LVK discussed we should move to O4 preparation soon. * Ondotori maintenance : PSL2, MCF, IXV, IXA, EXA, COOLERs, CRYDR *[[https://www.icrr.u-tokyo.ac.jp/~washimi/KAGRA/SEM/fig_RT/]] * FFU operation & particle counter (if we open the OMC) |
* Maybe, we don't need to discuss about O3c |
Line 133: | Line 100: |
* Schedule for O4 * Expanded style chief meeting was held in 6/15 * Jul. - Aug. DRFPMI lock trial * Apply sensor correction to SR suspensions * After them, we will start the upgrading tasks * PEM tasks for O4 will be discussed after this meeting with SEO * GND issue * Cabling issue * New PEM(?) |
|
Line 136: | Line 113: |
* We started the rack design with AEL people | |
Line 153: | Line 131: |
* Study of the 116 Hz acoustic injection to REFL table[[attachment:PEM_meeting_200612.pdf|pdf]] | * Study of the 116 Hz acoustic injection to REFL table |
Line 156: | Line 134: |
* Progress of the acoustic injection analysis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11754|pdf]] | * Progress of the acoustic injection analysis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11777|JGW-G2011777]] * Fujikawa * Lock loss study * Progress of the ICA analysis |
Weekly PEM meeting
- 2020/06/26(Fri) 16:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Conference issue
- JPS meeting
Online meeting web
- Yokozawa will present about the PEM activity
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- Yokozawa is supprted by C2C program
General issue
- Interferometer status
- Now interferometer is post-observation
- It may continue to end of June
- Request 1 day for PEM injection
- IMC scattered light check by GigE camera (6/30 Kokeyama, Yokozawa)
- Check the OMC leg vibration
6/25 early morning PRFPMI lock with better alignment -> If you interested in, you can use data
- Earthquakes at Hida area is serious
- Frequency was reduced
- Earthquake in Japan is frequent, suspension master guardian worked well
- Schedule for O4 will be discuss later
- Now interferometer is post-observation
- Tasks for post-commissioning
- Acoustic injection
6/5 : Day 1 : For only REFL (remote work) -> study of nonlinearity & up/down conversion -> DAQ trouble
- 6/11 : Day 2 : re-measurement of Day 1 (REFL) + PSL
Unclear : Day 3 : BS, SR, ITMX <<Before DRFPMI study (Jul.)>>
- Scattered light
- One of the hammering test (lower priority, open the chamber and check)
- OMC chamber vibration RMS (lower priority, open the chamber and check)
- IMC scattered light by GigE camera (Explained avobe)
- Line noise investigation by PEM
- No action from DAC, SEO and noise budget team. Maybe skipped.
- Acoustic injection
- Working style (COVID-19 related)
From July, (If U-tokyo level became 0.5) we can work as usual(maybe), if you have a plan to visit KAGRA site, please contact to Yokozawa first
- Situation is unclear, I will explain in this meeting.
- Useful management tools
Jurnal paper issue
- PTEP (2) : noise budget(K.Yamamoto)
- Start investigation (?)
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Submitted to CPC>>
Acoustic injection paper (Washimi) <<Analysis ON GOING>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start investigation>>
Target journal->to be discussed later (PTEP?)
- Study of the new environmental noise investigation technique using the portable monitors and Chromebook(仮)
- section
- Introduction
- Environmental noise
- Portable PEM2 : Chromebook type
4.1 USB type PEMs
4.2 Combination with Chromebook and USB tpye PEMs
4.3 Recording system and offline analysis
4.4 Vibration injection
- Examples of noise investigation
5.1 44Hz vibration noise
5.2 Sound and vibration from air conditioner and FFU
5.3 Oshino-san, Shimode-san magnetic field with circuit
5.4 Noise investigation at OMC chamber
- Conclusion
Acoustic reverberation paper (Washimi+Virgo) <<PLAN>>
Magnetic field paper (Washimi+) <<PLAN>>
Ground motion paper (Yokozawa+) <<PLAN>>
PEM summary note (Yokozawa+) <<PLAN>>
- Other topics
- If you have interested in, please contact to Yokozawa and Washimi first
- We took many environmental data
- Six Seismometer(Miyo+)
- Many microphones and accelerometers(Yokozawa+)
- Weather vs environment
- Temperature vs suspension
- Earthquake vs magnetic-field
- Non linearity noise study
- Line noise investigation(Yokozawa+)
Preparation for O3c / O4
- for O3c
- Maybe, we don't need to discuss about O3c
- Schedule for O4
- Expanded style chief meeting was held in 6/15
- Jul. - Aug. DRFPMI lock trial
- Apply sensor correction to SR suspensions
- After them, we will start the upgrading tasks
- Jul. - Aug. DRFPMI lock trial
- PEM tasks for O4 will be discussed after this meeting with SEO
- GND issue
- Cabling issue
- New PEM(?)
- Expanded style chief meeting was held in 6/15
- for O4 preparation
- We found new ground in the center area
- We started the rack design with AEL people
cabling (github204)
ondotori (github205)
water fluid (github207)
read out of the lightning sensor (github182)
- RF monitor
- tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : chikauchu
- gravity gradient (Newtonian noise)
- Superconducting Gravimeter
- TOBA
Analysis report
- Yokozawa
- Study of the 116 Hz acoustic injection to REFL table
- Washimi
Progress of the acoustic injection analysis JGW-G2011777
- Fujikawa
- Lock loss study
- Progress of the ICA analysis
- Omicron and hveto study(Someone)