⇤ ← Revision 1 as of 2020-07-20 17:37:22
959
Comment:
|
← Revision 2 as of 2020-07-20 17:39:35 ⇥
771
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
2020/07/10(Fri) 16:00-17:00 | 2020/07/17(Fri) 16:00-17:00 |
Line 12: | Line 12: |
* Sinet network troble * We couldn’t connect to Kamioka now * It will continue several month in the worst case * Network to Kashiwa server is no problem * Kashiwa network will stop next week 7/15. 7/16 * Due to the unstable of the suspension, we couldn’t lock the PRFPMI now. Sus team is fixing now |
* SINET network trouble was mostly fixed * Kashiwa PC mantenance * After reververing Kaashiwa, the data transfer will be restarted. |
Line 24: | Line 21: |
* No information from SEO * Still we have several measurements |
* Find the time in the RSE commissioning, we can do something |
Line 27: | Line 23: |
* DRFPMI * Jul. - Aug. |
* DRFPMI->RSE * Jul. -mid. Sep. |
Line 32: | Line 28: |
* Ondotori maintenance (After allowed the mine work) | |
Line 39: | Line 34: |
* Street view for the KAGRA experimental area |
PEM meeting
2020/07/17(Fri) 16:00-17:00
Zoom2 : https://zoom.us/j/6676627462
No KAGRA wiki page
Information
- KAGRA interferometer status
- SINET network trouble was mostly fixed
- Kashiwa PC mantenance
- After reververing Kaashiwa, the data transfer will be restarted.
- Paper status
- Status paper (PTEP) submitted to CPC
- Acoustic injection(CQG?) ongoing
- Post observation
- Find the time in the RSE commissioning, we can do something
DRFPMI->RSE
- Jul. -mid. Sep.
- Start from suspension control upgrade
- Preparation for O4
- Recabling
- We will do re-cabling all the PEMs
- GND issue
- Recabling
- Analysis progress
- Washimi (Acoustic injection)
- Street view for the KAGRA experimental area