Differences between revisions 1 and 2
Revision 1 as of 2020-07-20 17:37:22
Size: 959
Comment:
Revision 2 as of 2020-07-20 17:39:35
Size: 771
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
2020/07/10(Fri) 16:00-17:00 2020/07/17(Fri) 16:00-17:00
Line 12: Line 12:
  * Sinet network troble
   * We couldn’t connect to Kamioka now
   * It will continue several month in the worst case
   * Network to Kashiwa server is no problem
     * Kashiwa network will stop next week 7/15. 7/16
   * Due to the unstable of the suspension, we couldn’t lock the PRFPMI now. Sus team is fixing now
  * SINET network trouble was mostly fixed
  * Kashiwa PC mantenance
   * After reververing Kaashiwa, the data transfer will be restarted.
Line 24: Line 21:
  * No information from SEO
  * Still we have several measurements
  * Find the time in the RSE commissioning, we can do something
Line 27: Line 23:
 * DRFPMI
  * Jul. - Aug.
 * DRFPMI->RSE
  * Jul. -mid. Sep.
Line 32: Line 28:
  * Ondotori maintenance (After allowed the mine work)
Line 39: Line 34:
  * Street view for the KAGRA experimental area

PEM meeting

2020/07/17(Fri) 16:00-17:00

Zoom2 : https://zoom.us/j/6676627462

No KAGRA wiki page

Information

  • KAGRA interferometer status
    • SINET network trouble was mostly fixed
    • Kashiwa PC mantenance
      • After reververing Kaashiwa, the data transfer will be restarted.
  • Paper status
    • Status paper (PTEP) submitted to CPC
    • Acoustic injection(CQG?) ongoing
  • Post observation
    • Find the time in the RSE commissioning, we can do something
  • DRFPMI->RSE

    • Jul. -mid. Sep.
    • Start from suspension control upgrade
  • Preparation for O4
    • Recabling
      • We will do re-cabling all the PEMs
      • GND issue
  • Analysis progress
    • Washimi (Acoustic injection)
    • Street view for the KAGRA experimental area

KAGRA/Subgroups/PEM/Meeting/200717/Agenda (last edited 2020-07-20 17:39:35 by tatsuki.washimi)