Differences between revisions 1 and 10 (spanning 9 versions)
Revision 1 as of 2020-08-25 00:04:54
Size: 397
Comment:
Revision 10 as of 2020-10-15 06:52:15
Size: 655
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2020-08-07 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST)  * 2020-10-23 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST)
Line 7: Line 7:
 * Seismometer analysis(Francesca)
 * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
 * Virgo ENV investigation
 * Acoustic injection (Washimi)
 * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)[[attachment:PEM_200828.pdf|pdf]]
 * the ongoing infrastructure mitigation works for AdV+ (Federico)[[attachment:Virgo-KAGRA ENV meeting 28 Aug 2020.pdf|pdf]]
 * Acoustic injection (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11880|JGW-G2011880]]
 * Seismometer analysis(Francesca)[[attachment:KAGRA-vel-array.pdf|pdf]]
Line 12: Line 13:
  * 21st or 28th Aug. about KAGRA seismic motion   * 18th Sep. about KAGRA seismic motion

Virgo-KAGRA PEM meeting

Agenda

  • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)pdf

  • the ongoing infrastructure mitigation works for AdV+ (Federico)pdf

  • Acoustic injection (Washimi) JGW-G2011880

  • Seismometer analysis(Francesca)pdf

  • Next meeting
    • 18th Sep. about KAGRA seismic motion

KAGRA/Subgroups/PEM/Meeting/200828/Agenda (last edited 2020-10-15 06:56:24 by TakaakiYokozawa)