Differences between revisions 1 and 11 (spanning 10 versions)
Revision 1 as of 2020-08-25 00:04:54
Size: 397
Comment:
Revision 11 as of 2020-10-15 06:56:24
Size: 517
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2020-08-07 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST)  * 2020-10-23 (Fri) 17:30-18:30(JST) 10:30-11:30(CEST)
Line 7: Line 7:
 * Seismometer analysis(Francesca)
Line 9: Line 8:
 * Virgo ENV investigation
 * Acoustic injection (Washimi)
 * Next meeting
  * 21st or 28th Aug. about KAGRA seismic motion
 * the ongoing infrastructure mitigation works for AdV+ (Federico)
 * Acoustic injection paper(Washimi)
 * PEM measurement during blackout(Washimi)

 * Project of the KAGRA newtonian noise measurements
  * Seismometer analysis(Francesca)
  * Theory
  * Water fluid
  * TOBA(?)

Virgo-KAGRA PEM meeting

Agenda

  • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)

  • the ongoing infrastructure mitigation works for AdV+ (Federico)
  • Acoustic injection paper(Washimi)
  • PEM measurement during blackout(Washimi)
  • Project of the KAGRA newtonian noise measurements
    • Seismometer analysis(Francesca)
    • Theory
    • Water fluid
    • TOBA(?)

KAGRA/Subgroups/PEM/Meeting/200828/Agenda (last edited 2020-10-15 06:56:24 by TakaakiYokozawa)