Differences between revisions 1 and 6 (spanning 5 versions)
Revision 1 as of 2020-08-25 00:04:54
Size: 397
Comment:
Revision 6 as of 2020-08-28 13:47:14
Size: 526
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 * 2020-08-07 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST)  * 2020-08-28 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST)
Line 7: Line 7:
 * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
 * the ongoing infrastructure mitigation works for AdV+ (Federico)
 * Acoustic injection (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11880|JGW-G2011880]]
Line 8: Line 11:
 * KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
 * Virgo ENV investigation
 * Acoustic injection (Washimi)
Line 12: Line 13:
  * 21st or 28th Aug. about KAGRA seismic motion   * 18th Sep. about KAGRA seismic motion

Virgo-KAGRA PEM meeting

Agenda

  • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)

  • the ongoing infrastructure mitigation works for AdV+ (Federico)
  • Acoustic injection (Washimi) JGW-G2011880

  • Seismometer analysis(Francesca)
  • Next meeting
    • 18th Sep. about KAGRA seismic motion

KAGRA/Subgroups/PEM/Meeting/200828/Agenda (last edited 2020-10-15 06:56:24 by TakaakiYokozawa)