Size: 399
Comment:
|
Size: 515
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 8: | Line 8: |
* Virgo ENV investigation * Acoustic injection (Washimi) |
* the ongoing infrastructure mitigation works for AdV+ * Acoustic injection (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11880|JGW-G2011880]] |
Line 13: | Line 13: |
* 21st or 28th Aug. about KAGRA seismic motion | * 18th Sep. about KAGRA seismic motion |
Virgo-KAGRA PEM meeting
- 2020-08-28 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST)
Zoom2 : https://zoom.us/j/6676627462
Agenda
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
- the ongoing infrastructure mitigation works for AdV+
Acoustic injection (Washimi) JGW-G2011880
- Seismometer analysis(Francesca)
- Next meeting
- 18th Sep. about KAGRA seismic motion