Differences between revisions 2 and 5 (spanning 3 versions)
Revision 2 as of 2020-08-25 01:06:46
Size: 399
Comment:
Revision 5 as of 2020-08-28 13:46:18
Size: 515
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
 * Virgo ENV investigation
 * Acoustic injection (Washimi)
 * the ongoing infrastructure mitigation works for AdV+
 * Acoustic injection (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11880|JGW-G2011880]]
Line 13: Line 13:
  * 21st or 28th Aug. about KAGRA seismic motion   * 18th Sep. about KAGRA seismic motion

Virgo-KAGRA PEM meeting

Agenda

  • KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)

  • the ongoing infrastructure mitigation works for AdV+
  • Acoustic injection (Washimi) JGW-G2011880

  • Seismometer analysis(Francesca)
  • Next meeting
    • 18th Sep. about KAGRA seismic motion

KAGRA/Subgroups/PEM/Meeting/200828/Agenda (last edited 2020-10-15 06:56:24 by TakaakiYokozawa)