Size: 523
Comment:
|
← Revision 11 as of 2020-10-15 06:56:24 ⇥
Size: 517
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* 2020-08-28 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST) | * 2020-10-23 (Fri) 17:30-18:30(JST) 10:30-11:30(CEST) |
Line 8: | Line 8: |
* the ongoing infrastructure mitigation works for AdV+ * Acoustic injection (Washimi) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11880|JGW-G2011880]] * Seismometer analysis(Francesca) |
* the ongoing infrastructure mitigation works for AdV+ (Federico) * Acoustic injection paper(Washimi) * PEM measurement during blackout(Washimi) |
Line 12: | Line 12: |
* Next meeting * 21st or 28th Aug. about KAGRA seismic motion |
* Project of the KAGRA newtonian noise measurements * Seismometer analysis(Francesca) * Theory * Water fluid * TOBA(?) |
Virgo-KAGRA PEM meeting
- 2020-10-23 (Fri) 17:30-18:30(JST) 10:30-11:30(CEST)
Zoom2 : https://zoom.us/j/6676627462
Agenda
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
- the ongoing infrastructure mitigation works for AdV+ (Federico)
- Acoustic injection paper(Washimi)
- PEM measurement during blackout(Washimi)
- Project of the KAGRA newtonian noise measurements
- Seismometer analysis(Francesca)
- Theory
- Water fluid
- TOBA(?)