* the ongoing infrastructure mitigation works for AdV+ | * the ongoing infrastructure mitigation works for AdV+ (Federico) |
Line 13: | Line 13: |
* 21st or 28th Aug. about KAGRA seismic motion | * 18th Sep. about KAGRA seismic motion |
Virgo-KAGRA PEM meeting
- 2020-08-28 (Fri) 16:00-17:00(JST) 9:00-10:00(CEST)
Zoom2 : https://zoom.us/j/6676627462
Agenda
KAGRA detector status & Update of the KAGRA PEM from last meeting (Yokozawa)
- the ongoing infrastructure mitigation works for AdV+ (Federico)
Acoustic injection (Washimi) JGW-G2011880
- Seismometer analysis(Francesca)
- Next meeting
- 18th Sep. about KAGRA seismic motion