Size: 4539
Comment:
|
← Revision 5 as of 2020-09-04 15:57:37 ⇥
Size: 4851
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
==== Next PEM meeting ==== * Practice of Fujikawa-san presentation after regular PEM meeting |
|
Line 33: | Line 37: |
* Fujikawa-san is staying in Kamioka now | |
Line 49: | Line 54: |
* AC power lines : Coherence analysis is done ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14848]], Washimi]) | * AC power lines : Coherence analysis is done ([[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14848]], Washimi) |
Line 55: | Line 60: |
* Acoustic injection paper (Washimi) '''<<Analysis Almost DONE>>''' | * Acoustic injection paper (Washimi) '''<<WRITING>>''' |
Line 61: | Line 66: |
* Clean up the experimental area * Material control * Clean cabling * Most PEMs were recovered. * Buy new PEMs |
|
Line 73: | Line 72: |
* New PEMs * ACO microphone and power supply * New plastic box |
|
Line 101: | Line 96: |
==== Analysis report ==== |
==== Progress report ==== * Yokozawa * Investigation of 116Hz in acoustic injection * Bode plot of the Seismometer BLRMS [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=14957|klog14957]] |
Line 104: | Line 102: |
* Progress of the acoustic injection analysis [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11877|JGW-G2011877]] | * Aacoustic injection paper [[https://www.overleaf.com/project/5f51878b1e41b00001893ac7|overleaf]] * LIGO PEM paper is written ongoing [[https://dcc.ligo.org/LIGO-P2000343|LIGO-P2000343]] <- We can list it in our reference. * Water fluid monitor [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11949|JGW-T2011949]] |
Line 109: | Line 109: |
* Progress of the ICA analysis | * Kume * ICA analysis -> suspended until JPS |
Weekly PEM meeting
- 2020/09/04(Fri) 16:00-
- Regular meeting
Zoom2 : https://zoom.us/j/6676627462
Agenda
Next PEM meeting
- Practice of Fujikawa-san presentation after regular PEM meeting
Conference issue
- JPS meeting
Online meeting web
- Yokozawa will present about the PEM activity
- KIW7
- The 7th KAGRA International Workshop (National Central U., Taiwan), Dec. 18-20, 2020 (F2F meeting on Dec. 17-18)
- Yokozawa is supported by C2C program
- If you have interested in, please contact to Yokozawa
General issue
- Interferometer status
- RSE lock trial
- New suspension damping (modal damping)
- The spectrum of the error signal of the ALS DARM was improved in higher frequency region
- - 25th Sep.
- Occasional day
- 26th- Sep.
- Preparation for O4 work
- RSE lock trial
- Working style (COVID-19 related)
- Situation is unclear, I will explain in this meeting.
- Limitting the mine work
- Some collaborator came to Kamioka. Please contact to Yokozawa if you plan to go to Kamioka.
- Fujikawa-san is staying in Kamioka now
- Useful management tools
- Easy communication : Slack
- We want to start using the slack by communication. I will send the message to candidate
Task management : GitHub
Software management : GitHub
- Papers : Overleaf
Street view : Holobuilder
- Easy communication : Slack
Jurnal paper issue
PTEP (2) : noise budget(K.Yamamoto) Check list, slack <<Analysis ON GOING>>
- Environmental part
- Acoustic noise : on going (PEM injection analysis, Washimi)
- Seismic noise : summarise the actual seismic nois during O3GK? (who?)
- OMC leg vibration : 12th - 16th Sep. ?
AC power lines : Coherence analysis is done (http://klog.icrr.u-tokyo.ac.jp/osl/?r=14848, Washimi)
- Magnetic noise : skipped in this paper?
Newtonian : seismic newtonian -> from PTEP1 (or Francisca?) / water fluid newtonian -> skipped / air density -> skipped
- Line noise investigation
violin mode : Fitting analyisi is done (http://klog.icrr.u-tokyo.ac.jp/osl/?r=14886, Washimi)
- Environmental part
PTEP (3) : CAL, DET, PEM, GIF (Yokozawa) <<Referee comments>>
Acoustic injection paper (Washimi) <<WRITING>>
ICA for E-run/O3GK (Kume, Yokoyama) <<Analysis ON GOING>>
Portable PEMs (Yokozawa+) <<Start investigation>>
Preparation for O4
- PEM tasks for O4 will be discussed after this meeting with SEO
- GND issue
- Cabling issue
- Temperature control
- for O4 preparation
- We found new ground in the center area
- We started the rack design with AEL people
cabling (github204)
ondotori (github205)
water fluid (github207)
Discussion with Furuta-san & a company is started
read out of the lightning sensor (github182)
- Infrasound monitor @ Atotsu, Mozumi, (+ Toyama?)
- RF monitor
- tiltmeter
- RI detector
Rn : contact person -> Guillaume Pronostさん (ICRR, SK)
- cosmic-ray : plastic scintillator?
- gamma/neutron : 新学術地下宇宙
- start from a geiger counter?
- gravity gradient (Newtonian noise)
- Superconducting Gravimeter
- TOBA
- PEM injection for O4
- Large speaker @ End station
- Magnetic injection by large coil
Progress report
- Yokozawa
- Investigation of 116Hz in acoustic injection
Bode plot of the Seismometer BLRMS klog14957
- Washimi
Aacoustic injection paper overleaf
LIGO PEM paper is written ongoing LIGO-P2000343 <- We can list it in our reference.
Water fluid monitor JGW-T2011949
- Fujikawa
- Lock loss study
- Kume
ICA analysis -> suspended until JPS
- Omicron and hveto study(Someone)